303
08
|
Maintenance and Repair
8
Maintenance and Repair
Continuous maintenance is required in order to use all the functions of the robot normally and maintain
the optimal performance for a long period of time. Proper maintenance helps sustain product
performance and reliability, reduces maintenance costs, and extends the product life.
Maintenance must be carried out in accordance with all the safety instructions delineated in this manual
and be sure to check the latest operation manual in the Neuromeka website https://www.neuromeka.com/.
Furthermore, please contact the manufacturer for repair because it is handled directly by the manufacturer.
Never attempt to repair or disassemble the product yourself.
8.1
Inspection Items and Intervals
Inspection items and inspection intervals of the product should be decided with enough
consideration on the operational environment, e.g. loading condition. Inspection is usually carried
out on a regular basis such as routine inspection, quarterly inspection, and periodical inspection.
However, inspections should be made more frequently in the following environments: 1) with very
dusty and humid condition; 2) where there is a high probability of accidents due to vibration or
heat; 3) with longer operational hours with higher frequency or with severe loads.
Type
Interval
Objective
Inspection items
Routine
inspection
routinary
∙
Operational
environment and
alarm occurrence
∙
anomalies
environment
dust, gas
water, other liquids
temperature, humidity
robot arm
vibration, noise
abnormal heat
abnormal movement
Quarterly
inspection
One or more
times each
quarter
∙
exterior and
mounting
condition
robot arm
appearance
control box
cable appearance
connector appearance
connection sate
cooling fan noise, vibration
Periodic
inspection
One or more
times every six
months
∙
cleaning
∙
checking various
measurement
values
∙
testing various
functions
robot arm
interior inspection
function inspection
control box
interior cleaning
filter cleaning
measurement of input power
voltage
measurement of insulation resistance
Update
Upon
occurrence of
events
∙
product update
software
IndyS/W
Conty application
documents
various user manuals
Website notices
Содержание INDY7
Страница 1: ...Version 2 3 0 2019 08 16...
Страница 2: ......
Страница 3: ......
Страница 5: ...5...
Страница 8: ......
Страница 12: ......
Страница 15: ......
Страница 128: ...128 05 Programming Now your jointMove setup is complete...
Страница 136: ...136 05 Programming Finally enter the motion name and touch OK Now the frameMove setting is complete...
Страница 144: ...144 05 Programming Now the setting for the blending of frameMove is completed...
Страница 152: ...152 05 Programming Now your home movement setup is complete...
Страница 162: ...162 05 Programming stop It stops program execution No setup is required...
Страница 257: ...257 The commands that can be executed by the digital input signals are listed as follows...
Страница 259: ...259 When the message Do you want to renew it appears touch Yes The message Renewal is complete is displayed Touch OK...
Страница 264: ...264 Robot statuses that can be associated with the digital output signals are listed as follows...
Страница 266: ...266 When the message Do you want to renew it appears touch Yes The message Renewal is complete is displayed Touch OK...
Страница 279: ...279 If you run Conty again the language is changed and shown as follows...
Страница 319: ...319 08 Maintenance and Repair On the next Maintenance Service screen touch Log Touch Sending Log...
Страница 321: ...321 09 Certification 9 Certification 9 1 Machinery Directive...
Страница 322: ...322 09 Certification 9 2 Electromagnetic Compatibility Directive...
Страница 325: ...325 10 Warranty Neuromeka Official Channal Copyright 2016 2022 Neuromeka All rights reserved www neuromeka com...