background image

27

Neptronic

®

Evaporative Humidification / Cooling System

www.neptronic.com

Routine Water Sampling and Testing

HYGIENE:

Your attention is drawn to the local Health & Safety Executive’s technical guidance on the control of Legionellosis in water

systems.  If inadequately maintained, water systems, of which any humidifier is a part, can support the growth of 

micro-organisms, including the bacterium that causes Legionnaires’ disease. Neptronic

®

has considered all aspects of this

equipment to reduce as far as possible the risk of Legionnaires’ disease and other similar conditions, but it is important

that users are aware of their responsibilities in reducing the risk of Legionellosis.

To prevent the growth of Legionella, users are required to:

1.

Carry out a risk assessment of the water system using a competent person, and implement an appropriate 

monitoring and control regime.

2.

Avoid water temperatures which favour the growth of Legionella.

3.

Avoid water stagnation.

4.

Clean and disinfect the system in accordance with the Health & Safety Executives technical guidance and 

instructions in this manual.

5.

The SK VAP system MUST be connected to a clean, potable mains water supply.  It is the responsibility of the

user to ensure that the water system complies with local regulations and bylaws, particularly those for the 

control of Legionella bacteria.  

The use of mains water fed tanks and reservoirs is only permitted as part of a managed water treatment 

system..

On commissioning and at regular intervals thereafter, test for possible water contamination using Dipslides. Take 

samples from the water supply to the SK VAP Matrix and from the SK VAP tank.

The Dipslides should be incubated for 2 days at 86°F (30°C).

1. 

If the microbial count from the tank exceeds 10

3

cfu/ml, the system should be turned off and disinfected using

a 50 ppm chlorine solution for one hour before being put back into use.

2.

If the microbial count in the water supply to the SK VAP evaporative module exceeds 10

3

cfu/ml, this suggests 

contamination of the water system within the building. The system should be turned off and you should seek 

specialist advice on cleaning your water supply.

3.

If the water temperature anywhere in the system regularly exceeds 68°F (20°C) increase the frequency of water 

sampling. The frequency may be reduced if successive tests show a consistent level below 10

3

cfu/ml.

HEALTH AND SAFETY REQUIREMENTS

Every 6 months, samples for Legionnella analysis should be taken from the same places as described above, and the

analysis carried out by accredited laboratory. In the event that the Legionnella content exceeds 10

2

cfu/l, the humidifier

should be switched off and specialist advice sought regarding its disinfection.

1.

If biofilm (a slimy or gel-like deposit when wet, which might be dry and crisp in a dry system) is found during any 

inspection of the humidifier or water system, the humidifier MUST be switched off and not put back into operation 

until the system has been thoroughly cleaned with a suitable biocide with biofilm penetrating qualities such as 50mg/l 

chlorine dioxide solution. This work should only be carried out by fully trained specialist organisations or individuals.

2. The system must be left powered on to allow automatic flushing and cleaning cycles to occur

.

If the system is powered off for prolonged periods, water stagnation might occur and contamination result,

so the system, including any storage tanks or vessels should be drained and left dry. Before putting the system back

into service, the water pipework supplying the SK VAP should be purged carefully, avoiding the creation of

aerosols by splashing, and a water sample should be taken to ensure cleanliness. In the event that the humidifier 

pipework contains any residual water or has remained damp, and the temperature exceeded 68°F (20°C) , the 

SK VAP should be chlorinated using 50 ppm chlorine solution for 1 hour.

Содержание SK VAP

Страница 1: ...Montreal Quebec H4N 1R6 CANADA TEL 514 333 1433 FAX 514 333 3163 www neptronic com SK VAP Evaporative Humidifier Cooling System Manual Installation Commissioning Operation and Maintenance SK VAP Vers...

Страница 2: ...commercial and Residential application Gas fired humidifiers for commercial application Actuators to regulate air dampers or valves Electric heaters Humidistats Thermostats and other control peripher...

Страница 3: ...Stage 6 Connect Power Supply to SK VAP Control panel Page 16 Stage 7 Connect SK VAP Module Page 16 Stage 8 Connect Controls Page 16 Wiring Diagram Page 17 Programming mode Page 18 Alarm and notificati...

Страница 4: ...4 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 5: ...rotect the user from fibres or dust If dust is generated during handling it is recommended that respiratory protection is worn Damage to the evaporative material will affect the performance of the hum...

Страница 6: ...n water supply multi stage control is an option which individually operates sec tions of the system for closer control Modular construction facilitates a range of system sizes and efficiencies to matc...

Страница 7: ...al applications The evaporative matrix consists of modular cassettes with low pressure drop which are available in a range of sizes and efficiencies The SK VAP evaporative module is constructed from r...

Страница 8: ...ammable material UL900 class 1 Safe hygienic resist ance to fungi according to JIS L 1902 ASTM G26 96 2002 Immersion Pump 110 230 V 50 60 Hz IP 55 CE UL CSA Approved 1 2 15mm Pipe work Inlet Solenoid...

Страница 9: ...Outputs Control Options Fault Diagnostics Option 12 300mm wide x 17 420mm high x 6 140mm deep 14 5 lb 6 5 kg 110 V AC fused at 10 Amps in the US 490 Watts max Common fault alarm volt free contacts On...

Страница 10: ...Step 1 Positioning the Evaporative Module Step 2 Install blanking plates Step 3 Connect feed water supply Step 4 Connect to open drain Step 5 Position and mount Control panel Step 6 Connect power supp...

Страница 11: ...and primed and have enough head to overcome the pressure of the system and for hygiene reasons completely drain down On commissioning the system drainage of the humidification section should be tested...

Страница 12: ...rative Module has been positioned in the waterproof section of air handling unit non corrosive blanking plates not supplied must be installed to prevent air bypass around the Module in the AHU Typical...

Страница 13: ...Evaporative Module inlet as possible via two 1 2 15mm compression fittings It is advisable to mount the PureFlo Ag outside the AHU for ease of access Typically 1 2 15mm interconnecting copper pipework...

Страница 14: ...m copper or stainless pipework The drain assembly can be reversed to face in the opposite direction to suit either left or right feed pipe work This drain assembly should be connected to the main buil...

Страница 15: ...and the SK VAP Control Panel see Wiring Diagram on page 17 The SK VAP Control panel must have an electrical disconnect switch not supplied fitted within 39 1m for purposes of maintenance and emergenc...

Страница 16: ...trol panel This is essential for the purposes of maintenance and emergencies The electrical power cable to SK VAP Control panel should be suitably rated for a 120Vac 10 Amp load in the US The power su...

Страница 17: ...17 Neptronic Evaporative Humidification Cooling System www neptronic com Wiring Diagram...

Страница 18: ...18 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 19: ...19 Neptronic Evaporative Humidification Cooling System www neptronic com...

Страница 20: ...20 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 21: ...21 Neptronic Evaporative Humidification Cooling System www neptronic com...

Страница 22: ...22 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 23: ...ve Module has a feed water supply in excess of 29 psi 2 bar connected to the supplied filling hose Ensure that the PureFlo Ag system is installed Check all joints and fittings for leaks 5 Drain instal...

Страница 24: ...uipment are available to carry out disinfection as per the method statement in the cleaning and disinfection section of this manual 3 Putting the System into Operation Check that all operating paramet...

Страница 25: ...e is the number of running hours since the last service 3 The Total Runtime is the total number of hours the humidifier has been in operation After the humidifier has been serviced the Runtime hours c...

Страница 26: ...ater inlet soenoid valve strainer yes yes Check pump operation yes yes Check all hoses yes yes Check water distribution header pipes yes yes Clean water distribution header pipes yes Check drain valve...

Страница 27: ...r one hour before being put back into use 2 If the microbial count in the water supply to the SK VAP evaporative module exceeds 103 cfu ml this suggests contamination of the water system within the bu...

Страница 28: ...ive Matrix Cassette 300 250 150 85 Type B HU02 200 25 06 Evaporative Matrix Cassette 300 500 150 85 Type B HU02 200 25 07 Evaporative Matrix Cassette 600 250 150 85 Type B HU02 200 25 08 Evaporative M...

Страница 29: ...across the face of the humidifier and ensure it is within the specification 4 Insufficient water is being supplied to the matrix Check the rotation of the Module pump Check the water supply pressure...

Страница 30: ...e layout of the humidifier pipe work for example where system pipe work splits into H or U shape ensure that disinfection solution reaches all pipe work end of lines Additional procedures will be requ...

Страница 31: ...be overridden refer to the programming section of this manual Step 4 Add disinfection solution Add the solution to the water sump tray and allow to mix Measure the strength of the disinfection solutio...

Страница 32: ...emove scale from individual cassettes Using a soft brush lightly brush any loose scale from the surface of the matrix Lower the individual cassettes into the descaling solution Keep each matrix casset...

Страница 33: ...2750mm 108 HumEvap System Efficiency Matrix Depth A 75 Efficient 100mm 4 B 85 Efficient 150mm 6 C 95 Efficient 200mm 8 X X X X HumEvap OEM Version If Applicable C OEM Circulating D OEM Direct Feed Pro...

Страница 34: ...34 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 35: ...35 Neptronic Evaporative Humidification Cooling System www neptronic com...

Страница 36: ...Neptronic 400 boul Lebeau Montreal Quebec H4N 1R6 CANADA TEL 514 333 1433 FAX 514 333 3163 www neptronic com...

Отзывы: