14
Neptronic
®
www.neptronic.com
Evaporative Humidification / Cooling System
Step 4 - Install Drain Pipework
The SK VAP Evaporative Module features an integrated drain and overflow which must be connected to the main
building drain with 3/4” (20mm) copper or stainless pipework. The drain assembly can be reversed to face in the
opposite direction to suit either left or right feed pipe-work. This drain assembly should be connected to the main building drain
via the 3/4” (20mm) connection. Drain line must be directed to an open drain. No drain trap is required. Risk of return from
main drain to overflow.
1
5
1
2
5
6
8
Drain pump
Integrated Overflow
3/4” (20mm) Drain Plumbing
(Not supplied)
3/4” (20mm) Tee
Содержание SK VAP
Страница 4: ...4 Neptronic www neptronic com Evaporative Humidification Cooling System...
Страница 17: ...17 Neptronic Evaporative Humidification Cooling System www neptronic com Wiring Diagram...
Страница 18: ...18 Neptronic www neptronic com Evaporative Humidification Cooling System...
Страница 19: ...19 Neptronic Evaporative Humidification Cooling System www neptronic com...
Страница 20: ...20 Neptronic www neptronic com Evaporative Humidification Cooling System...
Страница 21: ...21 Neptronic Evaporative Humidification Cooling System www neptronic com...
Страница 22: ...22 Neptronic www neptronic com Evaporative Humidification Cooling System...
Страница 34: ...34 Neptronic www neptronic com Evaporative Humidification Cooling System...
Страница 35: ...35 Neptronic Evaporative Humidification Cooling System www neptronic com...
Страница 36: ...Neptronic 400 boul Lebeau Montreal Quebec H4N 1R6 CANADA TEL 514 333 1433 FAX 514 333 3163 www neptronic com...