background image

5

Neptronic

®

Evaporative Humidification / Cooling System

www.neptronic.com

Delivery and Storage

To ensure consistent quality, each evaporative module is inspected before leaving the factory.  If the module is to be put

into storage prior to installation, it must be stored under cover and protected from physical damage, dust, frost and rain.

It is recommended that the evaporative module be kept in its transit packaging for as long as possible prior to installation.

All evaporative modules are supplied  flat-packed for assembly ‘in situ’. The evaporative module must be 

assembled before water and electrical connections are made.

Please refer to SK VAP Evaporative Module Assembly Instructions supplied with the system.

Inspection

Upon receipt, remove the transit packaging and inspect the unit to ensure that no damage has occurred during transit.

Any visible damage must be reported to Neptronic

®

immediately. If the unit is to be put into storage, the packaging should

be replaced.

Handling Evaporative Material        

The SK VAP evaporative material should not be cut or crushed as doing so may generate dust.

SK VAP evaporative material is manufactured from glass fibre and is not classified as hazardous. It is recommended

that Personal Protection Equipment such as gloves, protective clothing and eye protection are used during handling to

protect the user from fibres or dust. If dust is generated during handling it is recommended that respiratory protection is

worn. Damage to the evaporative material will affect the performance of the humidifier and may result in water carry

over.

In the event of  contact, the following procedures should be observed:

Eye contact – wash well with water for a minimum of 15 minutes

Skin contact – wash well with soap and water.

Correct Method of Lifting

Lifting or handling must only be carried out by trained and qualified personnel. Ensure that the lifting operation has been

properly planned and risk assessed, and that all equipment has been checked by a skilled and competent Health & Safety

representative.

It is the customer's responsibility to ensure that operators are trained in handling heavy goods and to enforce the relevant

lifting regulations.

The packaged SK VAP unit may be carried by fork lift from the underside, but caution should be exercised to ensure that

the load is balanced before lifting. Refer to weights and measures section for system weight.

Disposal 

You must observe local laws and regulations when disposing of your SK VAP at the end of its working life. 

Use personal protective equipment as recommended in the handling section above when handling the evaporative

material. In addition, respiratory protection should be worn to avoid inhalation of dust or debris from the air flow which

may have accumulated on the material. 

The evaporative module is constructed from stainless steel which may be fully recycled. 

Содержание SK VAP

Страница 1: ...Montreal Quebec H4N 1R6 CANADA TEL 514 333 1433 FAX 514 333 3163 www neptronic com SK VAP Evaporative Humidifier Cooling System Manual Installation Commissioning Operation and Maintenance SK VAP Vers...

Страница 2: ...commercial and Residential application Gas fired humidifiers for commercial application Actuators to regulate air dampers or valves Electric heaters Humidistats Thermostats and other control peripher...

Страница 3: ...Stage 6 Connect Power Supply to SK VAP Control panel Page 16 Stage 7 Connect SK VAP Module Page 16 Stage 8 Connect Controls Page 16 Wiring Diagram Page 17 Programming mode Page 18 Alarm and notificati...

Страница 4: ...4 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 5: ...rotect the user from fibres or dust If dust is generated during handling it is recommended that respiratory protection is worn Damage to the evaporative material will affect the performance of the hum...

Страница 6: ...n water supply multi stage control is an option which individually operates sec tions of the system for closer control Modular construction facilitates a range of system sizes and efficiencies to matc...

Страница 7: ...al applications The evaporative matrix consists of modular cassettes with low pressure drop which are available in a range of sizes and efficiencies The SK VAP evaporative module is constructed from r...

Страница 8: ...ammable material UL900 class 1 Safe hygienic resist ance to fungi according to JIS L 1902 ASTM G26 96 2002 Immersion Pump 110 230 V 50 60 Hz IP 55 CE UL CSA Approved 1 2 15mm Pipe work Inlet Solenoid...

Страница 9: ...Outputs Control Options Fault Diagnostics Option 12 300mm wide x 17 420mm high x 6 140mm deep 14 5 lb 6 5 kg 110 V AC fused at 10 Amps in the US 490 Watts max Common fault alarm volt free contacts On...

Страница 10: ...Step 1 Positioning the Evaporative Module Step 2 Install blanking plates Step 3 Connect feed water supply Step 4 Connect to open drain Step 5 Position and mount Control panel Step 6 Connect power supp...

Страница 11: ...and primed and have enough head to overcome the pressure of the system and for hygiene reasons completely drain down On commissioning the system drainage of the humidification section should be tested...

Страница 12: ...rative Module has been positioned in the waterproof section of air handling unit non corrosive blanking plates not supplied must be installed to prevent air bypass around the Module in the AHU Typical...

Страница 13: ...Evaporative Module inlet as possible via two 1 2 15mm compression fittings It is advisable to mount the PureFlo Ag outside the AHU for ease of access Typically 1 2 15mm interconnecting copper pipework...

Страница 14: ...m copper or stainless pipework The drain assembly can be reversed to face in the opposite direction to suit either left or right feed pipe work This drain assembly should be connected to the main buil...

Страница 15: ...and the SK VAP Control Panel see Wiring Diagram on page 17 The SK VAP Control panel must have an electrical disconnect switch not supplied fitted within 39 1m for purposes of maintenance and emergenc...

Страница 16: ...trol panel This is essential for the purposes of maintenance and emergencies The electrical power cable to SK VAP Control panel should be suitably rated for a 120Vac 10 Amp load in the US The power su...

Страница 17: ...17 Neptronic Evaporative Humidification Cooling System www neptronic com Wiring Diagram...

Страница 18: ...18 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 19: ...19 Neptronic Evaporative Humidification Cooling System www neptronic com...

Страница 20: ...20 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 21: ...21 Neptronic Evaporative Humidification Cooling System www neptronic com...

Страница 22: ...22 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 23: ...ve Module has a feed water supply in excess of 29 psi 2 bar connected to the supplied filling hose Ensure that the PureFlo Ag system is installed Check all joints and fittings for leaks 5 Drain instal...

Страница 24: ...uipment are available to carry out disinfection as per the method statement in the cleaning and disinfection section of this manual 3 Putting the System into Operation Check that all operating paramet...

Страница 25: ...e is the number of running hours since the last service 3 The Total Runtime is the total number of hours the humidifier has been in operation After the humidifier has been serviced the Runtime hours c...

Страница 26: ...ater inlet soenoid valve strainer yes yes Check pump operation yes yes Check all hoses yes yes Check water distribution header pipes yes yes Clean water distribution header pipes yes Check drain valve...

Страница 27: ...r one hour before being put back into use 2 If the microbial count in the water supply to the SK VAP evaporative module exceeds 103 cfu ml this suggests contamination of the water system within the bu...

Страница 28: ...ive Matrix Cassette 300 250 150 85 Type B HU02 200 25 06 Evaporative Matrix Cassette 300 500 150 85 Type B HU02 200 25 07 Evaporative Matrix Cassette 600 250 150 85 Type B HU02 200 25 08 Evaporative M...

Страница 29: ...across the face of the humidifier and ensure it is within the specification 4 Insufficient water is being supplied to the matrix Check the rotation of the Module pump Check the water supply pressure...

Страница 30: ...e layout of the humidifier pipe work for example where system pipe work splits into H or U shape ensure that disinfection solution reaches all pipe work end of lines Additional procedures will be requ...

Страница 31: ...be overridden refer to the programming section of this manual Step 4 Add disinfection solution Add the solution to the water sump tray and allow to mix Measure the strength of the disinfection solutio...

Страница 32: ...emove scale from individual cassettes Using a soft brush lightly brush any loose scale from the surface of the matrix Lower the individual cassettes into the descaling solution Keep each matrix casset...

Страница 33: ...2750mm 108 HumEvap System Efficiency Matrix Depth A 75 Efficient 100mm 4 B 85 Efficient 150mm 6 C 95 Efficient 200mm 8 X X X X HumEvap OEM Version If Applicable C OEM Circulating D OEM Direct Feed Pro...

Страница 34: ...34 Neptronic www neptronic com Evaporative Humidification Cooling System...

Страница 35: ...35 Neptronic Evaporative Humidification Cooling System www neptronic com...

Страница 36: ...Neptronic 400 boul Lebeau Montreal Quebec H4N 1R6 CANADA TEL 514 333 1433 FAX 514 333 3163 www neptronic com...

Отзывы: