2-2 Setup and Operation
Desktop Setup
Set up the desktop systems by making the following connections. (See the following subsection,
Minitower Setup, if setting up a minitower system).
1.
At the rear of the system, set the voltage selector switch to 115V or 230V and plug the
power cord into the system power socket (see Figure Section 2-1).
CAUTION:
The correct AC input voltage must be
properly set. Select the appropriate voltage with the
voltage selector switch located at the rear of the sys-
tem.
Figure Section 2-1 Desktop Voltage Selector Switch
Содержание PowerMate VP75
Страница 147: ...Desktop Repair 5 21 ...
Страница 173: ...Minitower Repair 6 25 ...