finish framing - after appliance installation
Option 2 illustrated (appliance not
shown)
Insulation
* ONLY APPLICABLE TO OPTION 2 AND 3 - Opening
must
be centered in enclosure on appliance. Dimensions represent
finished sizes and where applicable should be adjusted to include finish material thickness.
minimum framing
see-thru flush
Ref
LV38-1
LV50-2
LV62
LV74
K
39 15/16” (101.4cm)
39 15/16” (101.4cm)
39 15/16” (101.4cm)
39 15/16” (101.4cm)
E
16 3/16” (41.1cm)
16 3/16” (41.1cm)
16 3/16” (41.1cm)
16 3/16” (41.1cm)
F
53 13/16” (136.7cm)
65 13/16” (167.2cm)
77 13/16” (197.6cm)
89 13/16” (228.1cm)
J
Optional - Appliance does not need to be elevated above floor
L
73” (185.4cm)
73” (185.4cm)
91” (231.1cm)
91” (231.1cm)
Q*
2” min and 3” max
(Q x R)*
80 sq. in.
160 sq. in.
Ceiling
K
R
E
F
J
L
Q
Drywall
Finish framing
must
be built after
appliance has been placed in its
final position and
venting connected.
note:
Although the minimum enclosure
height for the LV series is 73”,
some venting configurations
that require more vertical rise
will require a larger enclosure to
provide minimum vertical clear-
ance between vent pipes and