VJ-1604
Maintenance Manual
7 Adjustment
7-19
Rev.-00
6. When starting boot record installation on sub
controller board, LCD display on the plotter
control panel changes to [Sending boot code xx].
7. When starting system record installation on sub
controller board, LCD display on the plotter
control panel changes to [Sending sys code xx].
This process takes several minutes to complete.
8. When completing sub controller firmware
installation, LCD display on the plotter control
panel changes to [Transfer complete].
Buzzer sounds three times.
s
㧿㨑㨚㨐㨕㨚㨓ޓ㨎㨛㨛㨠ޓ㨏㨛㨐㨑ޓ㨤㨤
㧿㨑㨚㨐㨕㨚㨓ޓ㨟㨥㨟ޓ㨏㨛㨐㨑ޓ㨤㨤
㨀㨞㨍㨚㨟㨒㨑㨞ޓ㨏㨛㨙㨜㨘㨑㨠㨑
Содержание ValueJet VJ-1604
Страница 2: ......
Страница 14: ...VJ 1604 Maintenance Manual 12 ...
Страница 24: ...1 Safety Instructions VJ 1604 Maintenance Manual Rev 00 1 10 ...
Страница 42: ...3 Specifications VJ 1604 Maintenance Manual Rev 00 3 8 ...
Страница 198: ...4 Parts Replacement VJ 1604 Maintenance Manual Rev 00 4 156 ...
Страница 266: ...5 Self Diagnosis Mode VJ 1604 Maintenance Manual Rev 00 5 68 ...
Страница 404: ...10 Appendix VJ 1604 Maintenance Manual Rev 00 10 8 ...
Страница 420: ...VJ 1604 Maintenance Manual Supplement Exploded View 16 ...
Страница 421: ......
Страница 422: ......