2902
2903
5.1.3. Attaching the turnbuckle
Figure. 5.1.3. - 26. Turnbuckle
Number
Component
Quantity
1.
Pin Ø45x110
2 pcs
2.
Washer M45
4 pcs
3.
Cotter Ø8x71
2 pcs
1. Replace the washer (2) and fasten the turnbuckle to the seed and fertiliser drill with a
mounting pin (1).
2. Lock the mounting pin in place with the cotter (3).
3. Repeat steps 1-2 for the second turnbuckle of the cylinder.
5.1.4. Mounting the front levelling board
The front levelling board is an accessory. Using the front levelling board requires
that wheel packer be installed.
DANGER
The mounting of the front levelling board requires two people.
DANGER
Use a hoisting accessory when mounting the front levelling board.
Operation and maintenance
manual
Cerex 300
1.00
39 (156)
Содержание Cerex 300 SeedPilot
Страница 159: ...Hydraulic schematic Appen dix 2 Cerex 300 1 Appendix 2 Hydraulic schematic...
Страница 160: ...Hydraulic schematic Appen dix 2 Cerex 300 2...
Страница 161: ...Electrical Diagram Annex 3 Cerex 300 1 Annex 3 Electrical Diagram...
Страница 162: ...Electrical Diagram Annex 3 Cerex 300 2...
Страница 163: ...Electrical Diagram Annex 3 Cerex 300 3...