2966
7.1.2.5. Checking the tightness of the working platform bolts
Figure. 7.1.2.5. - 116. Working platform bolts
1. Check that the 6 bolts (M12) (2) of the working platform are tight.
Tighten the bolts, if needed.
2. Check that the 4 bolts (M16) (1) near the lifting cylinder are tight.
Tighten the bolts, if needed.
Figure. 7.1.2.5. - 117. Working platform U-bolts
3. Check that the 8 nuts ( M8)(2) of the U-bolts (1) are tight.
Tighten the bolts, if needed.
Operation and maintenance
manual
Cerex 300
1.00
103 (156)
Содержание Cerex 300 SeedPilot
Страница 159: ...Hydraulic schematic Appen dix 2 Cerex 300 1 Appendix 2 Hydraulic schematic...
Страница 160: ...Hydraulic schematic Appen dix 2 Cerex 300 2...
Страница 161: ...Electrical Diagram Annex 3 Cerex 300 1 Annex 3 Electrical Diagram...
Страница 162: ...Electrical Diagram Annex 3 Cerex 300 2...
Страница 163: ...Electrical Diagram Annex 3 Cerex 300 3...