5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
48
4983703/01 EN
VACUTAP
®
VV-Ex
3. For design with oil suction pipe, connect oil suction pipe screw connec-
tion. Check for leaks.
Figure 25: Oil suction pipe
4. Screw the on-load tap-changer head to the mounting flange. The tighten-
ing torque depends on the screw connection elements used.
Figure 26: On-load tap-changer head
Содержание VACUTAP VV-Ex
Страница 1: ...On load tap changer VACUTAP VV Ex Installation and commissioning instructions 4983703 01 EN ...
Страница 135: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 135 4983703 01 EN VACUTAP VV Ex 9 Drawings 9 1 External view 737774 ...
Страница 138: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 138 4983703 01 EN VACUTAP VV Ex 9 4 Installation drawing 738902 ...
Страница 139: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 139 4983703 01 EN VACUTAP VV Ex 9 5 Oil suction pipe 739172 ...
Страница 142: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 142 4983703 01 EN VACUTAP VV Ex 9 8 Mounting drawing 898866 ...
Страница 149: ......