6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
123
4983703/01 EN
VACUTAP
®
VV-Ex
6.3.2.2 Bleeding suction pipe on pipe connection S
1. Remove screw cap from pipe connection S.
Figure 113: Pipe connection S
2. Open vent screw and bleed piping.
3. Close vent screw.
4. Seal vent screw with screw cap.
6.3.3 Checking motor-drive unit
NOTICE
Damage to the on-load tap-changer / de-energized tap-changer!
Damage to the on-load tap-changer / de-energized tap-changer due to actu-
ation of the on-load tap-changer / de-energized tap-changer without insulat-
ing fluid.
► Ensure that the selector / de-energized tap changer is fully immersed in
insulating fluid and that the oil compartment of the on-load tap-changer is
completely filled with insulating fluid.
Содержание VACUTAP VV-Ex
Страница 1: ...On load tap changer VACUTAP VV Ex Installation and commissioning instructions 4983703 01 EN ...
Страница 135: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 135 4983703 01 EN VACUTAP VV Ex 9 Drawings 9 1 External view 737774 ...
Страница 138: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 138 4983703 01 EN VACUTAP VV Ex 9 4 Installation drawing 738902 ...
Страница 139: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 139 4983703 01 EN VACUTAP VV Ex 9 5 Oil suction pipe 739172 ...
Страница 142: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 142 4983703 01 EN VACUTAP VV Ex 9 8 Mounting drawing 898866 ...
Страница 149: ......