5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
42
4983703/01 EN
VACUTAP
®
VV-Ex
5.3.1.1 Lifting top part of on-load tap-changer head off supporting flange
(bottom part)
NOTICE
Damage to the on-load tap-changer!
Small parts in the oil compartment may block the diverter switch insert,
thereby damaging the on-load tap-changer.
► Ensure that parts do not fall into the oil compartment.
► Check that all small parts are accounted for.
1.
CAUTION!
An unstably positioned on-load tap-changer may tip, re-
sulting in serious injuries and damage. Place on-load tap-changer on a
level surface and secure it against tipping.
2. Remove red-colored packaging material and transport material from on-
load tap-changer.
3. Ensure that the on-load tap-changer is in the adjustment position. The ad-
justment position is indicated in the on-load tap-changer connection dia-
gram included in delivery.
4. Ensure that the inspection window is sealed off with the cover.
5. Remove screws and locking washers on on-load tap-changer head cover.
Figure 16: On-load tap-changer head cover
Содержание VACUTAP VV-Ex
Страница 1: ...On load tap changer VACUTAP VV Ex Installation and commissioning instructions 4983703 01 EN ...
Страница 135: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 135 4983703 01 EN VACUTAP VV Ex 9 Drawings 9 1 External view 737774 ...
Страница 138: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 138 4983703 01 EN VACUTAP VV Ex 9 4 Installation drawing 738902 ...
Страница 139: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 139 4983703 01 EN VACUTAP VV Ex 9 5 Oil suction pipe 739172 ...
Страница 142: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 142 4983703 01 EN VACUTAP VV Ex 9 8 Mounting drawing 898866 ...
Страница 149: ......