5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
76
4983703/01 EN
VACUTAP
®
VV-Ex
2. Fill on-load tap-changer with new insulating fluid using one of the two free
pipe connections of the on-load tap-changer head.
Figure 56: Pipe connections S and R
5.4.10 Performing transformer ratio test after drying
NOTICE
Damage to the on-load tap-changer!
Damage to the on-load tap-changer due to transformer ratio test being in-
correctly performed.
► Ensure that the selector / de-energized tap changer is fully immersed in
the insulating fluid and that the oil compartment of the on-load tap-
changer is completely filled with insulating fluid.
► Only switch the on-load tap-changer from one operating position to the
next via the upper gear unit. You can use a short tube (diameter 25 mm)
with screwed-in coupling bolt (diameter 12 mm) with a hand wheel or
crank for this, for example. When using a drill, do not exceed a maximum
speed of 250 rpm.
► Always check the operating position reached through the inspection win-
dow in the on-load tap-changer head cover. Never overshoot the end po-
sitions, which are indicated in the connection diagram supplied with the
delivery.
► For multiple-column applications with a shared drive, link all on-load tap-
changer heads to one another using the horizontal drive shaft part.
Содержание VACUTAP VV-Ex
Страница 1: ...On load tap changer VACUTAP VV Ex Installation and commissioning instructions 4983703 01 EN ...
Страница 135: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 135 4983703 01 EN VACUTAP VV Ex 9 Drawings 9 1 External view 737774 ...
Страница 138: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 138 4983703 01 EN VACUTAP VV Ex 9 4 Installation drawing 738902 ...
Страница 139: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 139 4983703 01 EN VACUTAP VV Ex 9 5 Oil suction pipe 739172 ...
Страница 142: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 142 4983703 01 EN VACUTAP VV Ex 9 8 Mounting drawing 898866 ...
Страница 149: ......