Cabinet Mounting
– continued
Apr 2001
V04.03
71
SC
TM
4812ET RF and Power Cabinet Hardware Installation Manual
DRAFT
Figure 4-3: Mounting Bolt Configuration
SMALL FLAT WASHER
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÏÏÏÏÏ
ÏÏÏ
ÏÏÏ
ÏÏÏÏÏ
ÏÏÏÏÏ
ÏÏÏ
ROOFTOP
CONCRETE PAD
CONCRETE
ANCHOR BOLT
CGDS97400036
LARGE FLAT WASHER
MOUNTING BRACKET
ISOLATION PAD
M12 X 100 BOLT
INSULATING WASHER
(OPTIONAL)
LARGE FLAT WASHER
MOUNTING BRACKET
ISOLATION PAD
MOUNTING
STRUCTURE
(I–BEAM)
M12 NUT
LOCK WASHER
SMALL FLAT
WASHER
Rooftop (Elevated
Substructure) Mounting
Procedure
Mounting the cabinet on a rooftop requires that the roof load carrying
support structure be in place prior to mounting the cabinet. See Chapter
2, “Site Preparation” for details.
Roof load carrying limits must be reviewed and an
appropriate support structure must be installed to support
the RF and Power Cabinet as required.
WARNING
Once the support structure is in place, follow the procedures in Table 4-3
to mount the cabinet.
. . . continued on next page