Table C-7: AC Power Cabling Procedures
Step
Action
3
Route the AC power conduit to the rear or bottom (as appropriate) AC I/O panel on the cabinet and
terminate conduit.
4
Route the 208–240 VAC power wires from the power meter breaker box, through the AC power
conduit, through the I/O boot, to the AC load center.
5
Connect the AC wires to the appropriate terminals (see Chapter 5 for details).
Heat Dissipation
The minimum heat dissipated to prevent condensation
inside the cabinet under the extremes of environmental
conditions is 110 Watts for the RF Cabinet and 110 Watts
for the Power Cabinet. This can be accomplished by
following the Initial Power Up procedures in the SC
4812ET ATP manual.