5
Insert the assembly into outer housing to hear a click when engaged.
IMPORTANT:
Ensure that the marks are properly aligned.
Figure 46: Aligning the Marks of the Assembly
6
Place the split rubber gland on to the cable.
Figure 47: Placing the Split Rubber Gland
a
Place the tightening cone on to the split rubber gland.
Figure 48: Placing the Tightening Cone on Split Gland
b
Tighten the gland nut with a 21-mm wrench.
Figure 49: Tightening the Gland Nut
Wrench 21mm on flats
Torque: 2-2.5mm
CAUTION:
Tightening torque must not exceed 2.5 Nm.
MN007322A01-B
Chapter 3: SLX 5000 Installation
42