Moretti Forni P110G C/A Скачать руководство пользователя страница 11

 

UK/10 

5  

SPECIAL MAINTENANCE 

 
5.1  

PRELIMINARY SAFETY OPERATIONS 

WARNING!  All  special  maintenance  operations  must  be  carried  out 
by specialised technical personnel with a proper licence. 
Before  carrying  out  any  maintenance  operation,  disconnect  the  gas 
supply  by  turning off  the  main  supply  tap,  and  disconnect  the  power 
supply  by  turning  off  the  switches  fitted  on  the  outside  of  the  oven

 

and/or the proofer. 
All precautions are of importance to ensure that the oven remains in a 
good state, and failure to observe them  may result in serious damage 
which will not be covered by the warranty. 
WARNING! Periodically (at least once a year), and every time 
operating malfunctions occur, the appliance must be checked by a 
specialist technician who must check the general state of the 
appliance, and in particular the state of the burner. In the presence of 
any type of irregularity the burner must be replaced immediately. 
When any maintenance operations are carried out on the gas circuit, 
use LOCTITE 577 as a sealing agent 
 
5.2  

REPLACING PARTS OF THE BAKING CHAMBER 

 
5.2.1  

REPLACING THE LIGHT BULB 

After carrying out the operations described in 5.1, to replace the light bulb 
and/or the cover inside the baking chamber proceed as follows: 
-   Unscrew  the  cover  (fig.23  item  A)  and  replace  the  light  bulb  (fig.23 

item B) and/or the cover. 

-   Screw the cover back in place. 

 
5.2.2  

REPLACING THE LIGHTER 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
spark plug, proceed as follows: 
-   Raise the front protection (Fig.20 item A). 
-   Remove the lower cover. 
-   Remove the two fixing screws from the spark plug. 
-   Remove the right side panel by unscrewing the four fixing screws. 
-   Disconnect the wires from the lighter to the ignition card (item 23 plate 

A). 

-   Disconnect the spark plug faston connectors. 
-   Replace the lighter spark plug (item 16 plate A). 
-   Perform the above operations in reverse order to reassemble.

 

 

5.2.3  

REPLACING THE FLAME DETECTOR 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
flame detector, proceed as follows: 
-   Raise the front protection (Fig.20 item A). 
-   Remove the screws and the cover below. 
-   Remove the two flame detector fixing screws. 
-   Remove the right side panel by unscrewing the four fixing screws. 
-   Disconnect the wires from the flame detector to the ignition card (item 

23 plate A). 

-   Replace the flame detector (item 17 plate A). 
-   Perform the above operations in reverse order to reassemble. 
 

5.2.4  

REPLACING THE DIGITAL PYROMETER 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
digital baking control pyrometer, proceed as follows: 
-   Remove the two pyrometer fixing screws. 
-   Remove the pyrometer connectors; 
-   Replace the pyrometer (item 29 plate A). 
-   Perform  the  above  operations  in  reverse  order  to  reassemble,  making 

sure that the polarity of the connectors is correct. 

 

5.2.5  

REPLACING THE THERMOCOUPLE 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
thermocouple proceed as follows: 
-   Remove the right hand side panel by unfastening the four fixing screws. 
-   Unfasten the thermocouple fixing nut. 
-   Disconnect the two power cables to the thermocouple. 
-   Replace the thermocouple (item 32 plate A). 
-   Perform  the  above  operations  in  reverse  order  to  reassemble,  making 

sure that the polarity of the connectors is correct.

 

 
5.2.6  

REPLACING THE IGNITION CARD 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
ignition card, proceed as follows: 
-   Remove  the  right  hand  side  panels  by  unfastening  the  four  fixing 

screws. 

-  Disconnect the wires to the ignition card. 
-   Replace the ignition card (item 23 plate A). 
-   Perform the above operations in reverse order to reassemble. 

5.2.7  

REPLACING THE TRANSFORMER 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
transformer proceed as follows:

 

-   Remove the right side panel by unfastening the four fixing screws; 
-

 

Disconnect transformer electrical connections . 

-

 

Replace the transformer  (item 18 plate A). 

-   Perform the above operations in reverse order to reassemble. 

 
5.2.8.1   REPLACING THE TEMPERED GLASS (P110G) 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
tempered glass proceed as follows: 
-   Remove the fixing screws of the front door frame. 
-   Remove the front frame. 
-   Remove the front gasket. 
-    Replace  the  tempered  glass  (item  3  plate  A)  by  removing  it  from  the   

front. 

-   Perform the above operations in reverse order to reassemble. 
 

5.2.8.2   REPLACING THE TEMPERED GLASS (P150G) 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
tempered glass proceed as follows: 
- with the door open, remove the fastening screws from the inside part of 
the door . 
- Remove the inside part of the door. 
- Remove the gasket. 
- Replace the tempered glass (item 3 tab.A). 
-   Perform the above operations in reverse order to reassemble. 
 

5.2.9.1   REPLACING THE HANDLE SPRING (LEFT) 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
handle spring proceed as follows: 
-   Remove the left side panel by unscrewing the four fixing screws. 
-   Disconnect  the  spring  (item  14  plate  A)  by  unscrewing  the  two  fixing 

nuts. 

-   Replace the spring, calibrating the tension with the two nuts. 
-   To remount the panel, perform these operations in reverse order. 
 

5.2.9.2   REPLACING THE HANDLE SPRING (RIGHT, P150G) 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
handle spring proceed as follows: 
-   Unscrew the digital pyrometer screws  (plate A); 
-

 

Unscrew the digital pyrometer box screws (plate A); 

-

 

Unfasten the screws (plate A) holding the right side panel; 

-

 

Lift the rock wool; 

-

 

Unfasten the nut (plate A) holding the spring; 

-

 

Replace the spring (plate A); 

-

 

Perform the above operations in reverse order to reassemble. 

 

5.2.10   REPLACING THE REFRACTORY SURFACES  

After carrying out the operations described in 5.1, to replace the upper and 
lower refractory surfaces proceed as follows: 
-   Open the front door (item 4 plate A). 
-   Raise the upper refractory surface (item 27 plate A) by prying it up with 

a screwdriver. 

-   Raise the lower refractory surface (item 26 plate A) by prying it up with 

a screwdriver. 

-   Replace the refractory surfaces. 
-   Perform these operations in reverse order to reassemble. 
 

5.2.11   REPLACING 

THE 

BAKING 

CHAMBER 

SAFETY 

THERMOSTAT 

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
safety thermostat proceed as follows: 
-   Remove the two fixing screws. 
-   Disconnect the thermostat faston connectors. 
-   Remove the right side panel by unscrewing the four fixing screws. 
-

 

Open the front door (item 4 plate  A) and loosen the two screws on the 
top front part of the chamber that fasten the thermostat sensor. 

-   Remove the thermostat sensor, located inside the insulating rock wool, 

cutting out the rock wool around it (fig. 24). 

-   Replace  the  thermostat  (item  19  plate  A)  with  its  sensor  and  the  worn 

piece of rock wool, if necessary. 

-   Perform the above operations in reverse order to reassemble. 

 
5.3  

REPLACING PARTS OF THE PROOFER 

 
5.3.1  

REPLACING THE LIGHT BULB  

After  carrying  out  the  operations  described  in  5.1  above,  to  replace  the 
light bulb and/or cover, proceed as follows from the inside of the proofer: 
-   Unscrew  the  cover  (item  A  -  fig.25)  and  replace  the  bulb  (item  B  -

fig.25) and/or the cover. 

Содержание P110G C/A

Страница 1: ...Instructions manual Manuel d instructions Gas oven Four a gaz Cod 73300890 Ver A4 P110G P150G...

Страница 2: ...e problem FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance WARNING Improper installation adjustment alteration service o...

Страница 3: ...llow the instructions given below The manufacturer reserves the right to make improvements to the product and manual without necessarily updating existing products and manuals WARNING 1 The following...

Страница 4: ...cess to the ovens are located at the front 1 4 MODELS There are nine models available P110G C A P110G C B P150G C A P110G C A2 double chamber P110G C B2 double chamber P150G C A2 double chamber P110G...

Страница 5: ...d combustible construction Clearance must also be provided for servicing and for proper operation NOTE The label with the electric circuit arrangement is on the right lateral side on the models P110G...

Страница 6: ...the short upper pipes together insert all the screws move the tray holders together and tighten insert the four lower screws in the short base pipes and tighten move the central tray holders together...

Страница 7: ...ce selected should be in the immediate vicinity of the oven and within easy access Electrical supply for the equipment is 208 240V 1Ph 60Hz see rating plate fig 2 item A To carry out electrical connec...

Страница 8: ...e panel fig 20 item C Loosen the seal screw external the valve fig 17 item B Connect the U manometer to the pressure takeoff Turn the oven on as described in the instructions Measure the pressure Loos...

Страница 9: ...y covered or packed food 3 4 OPERATIONAL CHECK Once the baking chambers and the proofer are operational according to 3 2 and 3 3 check that the appliance functions Check that the exhaust works correct...

Страница 10: ...pe of irregularity the burner must be replaced immediately When any maintenance operations are carried out on the gas circuit use LOCTITE 577 as a sealing agent 4 3 PERIODS OF INACTIVITY If the applia...

Страница 11: ...y unfastening the four fixing screws Disconnect the wires to the ignition card Replace the ignition card item 23 plate A Perform the above operations in reverse order to reassemble 5 2 7 REPLACING THE...

Страница 12: ...ceed as follows Remove the control panel fixing screws Disconnect the faston connectors for both the yellow indicator and the light switch Replace the yellow indicator light item 14 plate B Replace th...

Страница 13: ...UK 12...

Страница 14: ...sence ni autres vapeurs ou liquides inflammables proximit de cet appareil ou de tout autre appareil AVERTISSEMENT L installation le r glage la modification la r paration ou l entretien incorrect de ce...

Страница 15: ...qu il contient Le constructeur se r serve le droit d apporter des modifications la production et au manuel sans devoir mettre jour la production et la documentation pr c dentes ATTENTION 1 Les indica...

Страница 16: ...nt elles doivent tre surveill es Les portes d acc s aux installations se trouvent sur la partie avant de l appareil 1 4 MOD LES Les mod les pr vus sont neuf P110G C A P110G C B P150G C A P110G C A2 do...

Страница 17: ...lation contactez votre technicien local agr REMARQUE Pr voir un d gagement suffisant entre le four et toute structure inflammable Pr voir en outre un d gagement suffisant puor l entretien et l utilisa...

Страница 18: ...ents tubulaires lat raux courts ins rer uniquement les vis les plus externes des l ments tubulaires avant et arri re longs ins rer les crous correspondant depuis le cot interne des pieds serrer le tou...

Страница 19: ...e effectu selon le National Electrical Code NEC ou ANSI NFPA70 aux Etats Unis et selon le Canadian Electrical Code CSA C22 2 au Canada Avant de commencer la proc dure de branchement v rifier que le sy...

Страница 20: ...lle indiqu e parmi les donn es techniques du TAB 1 le goulot de l air fig 21 d tail D doit poss der les caract ristiques suivantes cote X voir donn es techniques TAB 1 l injecteur doit tre celui indiq...

Страница 21: ...int rieur de la chambre il y a beaucoup de vapeur ouvrir la porte pour quelques minutes pour la faire sortir puis la refermer Augmenter la temp rature 150 C 300 F et laisser en fonction la chambre po...

Страница 22: ...dommages qui ne sont pas couverts par la garantie 4 2 NETTOYAGE Nettoyer tous les jours les parties externes au moyen d un chiffon sec fig 22 Pour le nettoyage externe viter en toute circonstance l u...

Страница 23: ...e D connecter les deux c bles d alimentation du thermocouple Remplacer le thermocouple d tail 32 tab A Pour remonter effectuer les op rations rebours veiller ce que les connecteurs soient connect s co...

Страница 24: ...correspondante l ext rieur de l tuve suivre les instructions report es ci apr s Enlever la poign e du thermostat d tail 5 tab B qui est fix e par pression D visser la bague de fixation d tail 6 tab B...

Страница 25: ......

Страница 26: ...2 195 x 4 195 x 6 Cod 72080780 72080780 72080780 72092060 72092060 72092060 Natural Gas 360 360 x 2 360 x 3 285 x 2 285 x 4 285 x 6 Cod 72005900 72005900 72005900 72092050 72092050 72092050 Air primar...

Страница 27: ...004710 72004710 Air primary regulation R gulation air primaire FIG 21 X mm LP Gas 16 x 2 16 x 4 16 x 6 Natural Gas 16 x 2 16 x 4 16 x 6 Inlet Pressure Pression l entr e inWC LP Gas Min 8 norm 11 Max 1...

Страница 28: ...3 9 1 16 23 13 33 W inch cm 8 1 16 21 8 1 16 21 8 1 16 21 P inch cm 57 9 32 146 73 5 16 186 61 13 16 157 lb kg 1378 625 1852 840 2050 929 P110L60A P110L80A P110L60B P110L80B P150L60A P150L80A X inch c...

Страница 29: ...H E F D I L N O C G M P C...

Страница 30: ...A D B C a b Fig 9...

Страница 31: ...A B C D Min Max...

Страница 32: ...P150G A P110G B...

Страница 33: ......

Страница 34: ......

Страница 35: ...A...

Страница 36: ...ule 22 Switch Interrupteur 23 Lighter card Fiche d allumage 24 Lamp holder Douille 25 Burner Br leur 26 Lower refractory plane Plan r fractaire inf rieur 27 Upper refractory plane Plan r fractaire sup...

Страница 37: ...B...

Страница 38: ...Light switch 5 Poign e Handle 6 Embout Ring nut 7 Thermostat Thermostat 8 Ampoule Lamp 9 Douille Lamp holder 10 Resistance Resistance 14 Voyant lumineux Warning ligth 16 Cover Calotte 17 Fixed wheel...

Страница 39: ...1 24 17 10 11 6 4 5 12 9 RA 10 20 2 3 4 13 RF 29 1 14 CF 20 6 29 TE 4 3 6 5 7 2 1 35 BLUE BLEU WHITE BLACK BLANC NOIR WHITE JOLLOW BLANC JAUNE GREEN BLACK VERT NOIR RED BLACK ROUGE NOIR WHITE VIOLET B...

Страница 40: ...chambre doitre HLD Left light chamber Lampe t moin chambre gauche TC Trasformer Transformateur RA Light up resistor R sistance d allumage RF Flame detector R v lateur de flamme TE Thermocouple Thermo...

Страница 41: ...74800040 Revisione 01 MOD P110L P150L 208 240Vac 1ph 1 1 LC1 ILC 240Vac 1ph 7 PE L2 L1 6 13 9 21 20 11 10 RX 18 15 14 19 17 12 16 STC TC 8 ITC 7 6 1 3 4 5 23 P150L LC2 31 30 32 20 21 208Vac 1ph D...

Страница 42: ...witch Interrupteur lumi re tuve ITC Thermostat switch Interrupteur thermostat TC Thermostat Thermostat STC Thermostat light Voyant lumineux du thermostat LC1 2 Light Lumi re RX Heating elements R sist...

Отзывы: