OPERATION
Section
3
A. FIELD OPERATION
Do not turn sharp corners with the Uni-Drill especially in direct drilling operations as this
will give massive disc to soil side thrust. When this happens the disc is parted from the seed
coulter and trash can then enter between them resulting in blockage to the seed flow. It is
better to lift the machine out of and into work when turning corners.
B. WORK
RATE
As there is no disc bounce due to the high inertia coulter system with press wheels,
relatively high ground speeds can be tolerated giving high work rates. (11 - 15 Km/hr). The
operating speed and the quality of work which results is controlled by field conditions but
where ever possible a steady speed should be maintained. As field conditions vary, it may be
necessary to adjust the coulter settings to maintain seed depth and cover.
C. DRILLING IN A CONVENTIONAL SEEDBED
When working in cultivated soil, most of the drill weight is carried on the press wheel
Rollers and tractor drawbar. Seed depth can be obtained by Extending or retracting the depth
control ram. The soil is usually tracked to the depth required by the disc seeding units and
consolidated by the press wheel rollers - this gives excellent seed soil contact equalling ideal
conditions for seed germination.
It is recommended that the centre of the field should be drilled first and the headlands last. If
the headlands are planted first then the tractor and drill will travel and turn on planted
ground, thus disturbing, compacting and moving seeds that have been placed at a constant
depth. Check the seeding depth in the field and on headlands, remember the headlands tend
to be more consolidated than the remainder of the field. If headlands are drilled last the field
is left tidier on completion.
On rougher types of seedbed the drill itself tends to be self levelling. The seed tube and disc
coulter units tend to move the soil from humps to hollows. IT IS NOT NECESSARY TO
HARROW AFTER SOWING. Harrowing will move seeds either shallower or deeper thus
giving uneven germination. Remember seeds that are planted two to three inches deep take
about two weeks longer to germinate and appear as weak plants, that are under stress and are
susceptible to disease and slugs
If rolling behind the drill on lighter soils is thought to be beneficial, remember that the seed
has been accurately placed at the ideal depth for early and even emergence. Rolling will
tend to flatten the ridge of soil between each press wheel mark and will in fact add to the
soil cover over the seed thus slowing emergence and probably reducing vigour. This extra
soil cover over the seed must be allowed for, when deciding drilling depth when starting the
field.
31
Содержание UNIDRILL 300
Страница 1: ...August 2001...
Страница 5: ...4 Safety Regulations...
Страница 7: ...6 Warning Symbols 1...
Страница 9: ...Safety Instruction Decals 8...
Страница 10: ...Safety Instruction Decals 9 25...
Страница 21: ...Settings 20 Ha 0 m 2 40 3 00 3 50 4 00 4 50 4 80 5 00 6 00 6 66 tr 62 5 50 43 37 5 33 3 31 3 30 25 22 5...
Страница 29: ...28...
Страница 41: ...Maintenance Tyre pressure chart for 10 0 75 15 3 Vredestein Tyres 40...
Страница 42: ...Optional Equipment Section 5 MS Flow Modulation 41...
Страница 44: ...Starting up 43...
Страница 45: ...Starting up 44...
Страница 46: ...Operation 45...
Страница 47: ...Operation 46...
Страница 48: ...Operation 47...
Страница 49: ...Operation 48...
Страница 50: ...Operation 49...
Страница 51: ...50 D E...
Страница 55: ...Dragarm Seeding Unit 47 48 54 Parts list...
Страница 59: ...Drawbar and Rear Axle Assembly 58 Parts list 47 48 45 1 2 49 3 4 50 51 52 53 53 A B 55 54 35...
Страница 61: ...Drive wheel Assembly 60 Parts list 26...
Страница 63: ...Seed Box Assembly S900520 S901537 62 Parts list...
Страница 65: ...Seed Box Drive Unit 64 Parts list...
Страница 67: ...Multiplicator Parts list 66...
Страница 69: ...MS Flow Modulation Parts list 1 3 2 7 10 8 9 11 6 5 4 15 14 12 13 68...
Страница 71: ...Linak Actuator Tramline Mechanism Parts list 1 5 2 7 6 4 3 9 8 70...
Страница 73: ...Seedbox Metering Parts Parts list 10 12 11 8 6 5 4 3 9 2 1 7 72...
Страница 75: ...SPI Vertical Lift Marker 74 Parts list...
Страница 77: ...Moore Vertical Lift Marker 17 13 16 47 48 Complete disc hub assembly 14 15 74 Parts list...
Страница 79: ...Electric Parts Sensors Parts list 1 4 3 2 76...
Страница 81: ...Electric Parts Chassis Parts list 17 18 16 19 27 11 9 8 10 12 14 15 13 3 1 2 7 4 6 5 24 25 20 21 22 23 26 78...
Страница 86: ...Calibration Charts Calibration charts for Rape Barley Peas and Field Beans 83...
Страница 87: ...Calibration Charts Calibration charts for Oats Mustard Phacelia and Radish 84...
Страница 88: ...Calibration Charts Calibration charts for Lucern Linseed Rye grass and Clover 85...
Страница 89: ...Notes 86...