16
2
1
Starting up
The user must comply with road traffic regulations. The hopper should be empty
when driving on the road, at a maximum speed of 25KPH.
TRANSPORT
Positioning the pins (1) in their
transport position.
- Raise the seed drill
- Insert the locking pins
- Lower the machine so that it rests on
the pins.
HYDRAULIC
CONNECTIONS
Double-action hydraulic system to lift the
seed drill.
Double-action hydraulic system for depth
control
Single-action hydraulic system controlling
side-markers and tramlining system.
Install the hydraulic hoses on support
(2)
The pressure lines are marked with red
probe covers.
The return lines are marked with blue
probe covers.
Содержание UNIDRILL 300
Страница 1: ...August 2001...
Страница 5: ...4 Safety Regulations...
Страница 7: ...6 Warning Symbols 1...
Страница 9: ...Safety Instruction Decals 8...
Страница 10: ...Safety Instruction Decals 9 25...
Страница 21: ...Settings 20 Ha 0 m 2 40 3 00 3 50 4 00 4 50 4 80 5 00 6 00 6 66 tr 62 5 50 43 37 5 33 3 31 3 30 25 22 5...
Страница 29: ...28...
Страница 41: ...Maintenance Tyre pressure chart for 10 0 75 15 3 Vredestein Tyres 40...
Страница 42: ...Optional Equipment Section 5 MS Flow Modulation 41...
Страница 44: ...Starting up 43...
Страница 45: ...Starting up 44...
Страница 46: ...Operation 45...
Страница 47: ...Operation 46...
Страница 48: ...Operation 47...
Страница 49: ...Operation 48...
Страница 50: ...Operation 49...
Страница 51: ...50 D E...
Страница 55: ...Dragarm Seeding Unit 47 48 54 Parts list...
Страница 59: ...Drawbar and Rear Axle Assembly 58 Parts list 47 48 45 1 2 49 3 4 50 51 52 53 53 A B 55 54 35...
Страница 61: ...Drive wheel Assembly 60 Parts list 26...
Страница 63: ...Seed Box Assembly S900520 S901537 62 Parts list...
Страница 65: ...Seed Box Drive Unit 64 Parts list...
Страница 67: ...Multiplicator Parts list 66...
Страница 69: ...MS Flow Modulation Parts list 1 3 2 7 10 8 9 11 6 5 4 15 14 12 13 68...
Страница 71: ...Linak Actuator Tramline Mechanism Parts list 1 5 2 7 6 4 3 9 8 70...
Страница 73: ...Seedbox Metering Parts Parts list 10 12 11 8 6 5 4 3 9 2 1 7 72...
Страница 75: ...SPI Vertical Lift Marker 74 Parts list...
Страница 77: ...Moore Vertical Lift Marker 17 13 16 47 48 Complete disc hub assembly 14 15 74 Parts list...
Страница 79: ...Electric Parts Sensors Parts list 1 4 3 2 76...
Страница 81: ...Electric Parts Chassis Parts list 17 18 16 19 27 11 9 8 10 12 14 15 13 3 1 2 7 4 6 5 24 25 20 21 22 23 26 78...
Страница 86: ...Calibration Charts Calibration charts for Rape Barley Peas and Field Beans 83...
Страница 87: ...Calibration Charts Calibration charts for Oats Mustard Phacelia and Radish 84...
Страница 88: ...Calibration Charts Calibration charts for Lucern Linseed Rye grass and Clover 85...
Страница 89: ...Notes 86...