Issue 03 – June 2018
48
CAM1000
Introduction
CAUTION: Weight approximately 40kg. Follow all correct lifting
techniques. Use lifting equipment when handling.
The CAM1000 units are self-contained filtration units designed to fit into the aluminium grid system
with your cleanroom. On spans of 3m or more, they will sit in between the larger reinforced ceiling
cross members.
They are designed to be used on their own, however if you do wish to connect two or more together
then up to 4 units can be daisy-chained from the IEC socket mounted on the side of the unit. If not
used to power a second CAM1000, then this socket can be used to power the lights in the room. This
way they are all turned on and off by a single switch.
Power Link Socket
Link Fuse Holder 3A(T)
Power Inlet Socket
Main Inlet Fuse
Power Switch
IMPORTANT: The loading on the whole system MUST NOT exceed 3amps in total. If in doubt
consult a qualified electrician.
The power switch above is an inline switch that requires a power supply. All the CAM1000
units and/or lights subsequent to this will be fed from this switch.
Содержание Cleanroom Kit 4M
Страница 1: ...Issue 03 June 2018 1 Cleanroom Kits ...
Страница 2: ...Issue 03 June 2018 2 Installation Guide ...
Страница 3: ...Issue 03 June 2018 3 ...
Страница 24: ...Issue 03 June 2018 24 Standard Wall Panel ...
Страница 25: ...Issue 03 June 2018 25 Door Panels ...
Страница 26: ...Issue 03 June 2018 26 Door Door is supplied fully assembled however for reference exploded view below ...
Страница 27: ...Issue 03 June 2018 27 Ceiling Assembly 4M 2m x 2m room ...
Страница 28: ...Issue 03 June 2018 28 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 29: ...Issue 03 June 2018 29 6M 3m x 2m room ...
Страница 30: ...Issue 03 June 2018 30 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 35: ...Issue 03 June 2018 35 Using CAM1000 in 9M 9M 12M 12M ...
Страница 36: ...Issue 03 June 2018 36 Top Door Runner Assembly ...
Страница 40: ...Issue 03 June 2018 40 5 ...
Страница 58: ...Issue 03 June 2018 58 6M 3m x 2m room ...
Страница 59: ...Issue 03 June 2018 59 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 60: ...Issue 03 June 2018 60 9M 3m x 3m room ...
Страница 61: ...Issue 03 June 2018 61 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 62: ...Issue 03 June 2018 62 12M 4m x 3m room ...
Страница 63: ...Issue 03 June 2018 63 12Mplus 4m x 3m room with 1m x 3m atrium ...
Страница 64: ...Issue 03 June 2018 64 Complete Cleanroom Layouts 4M 2m x 2m room 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 65: ...Issue 03 June 2018 65 6M 3m x 2m room ...
Страница 66: ...Issue 03 June 2018 66 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 67: ...Issue 03 June 2018 67 9M 3m x 3m room ...
Страница 68: ...Issue 03 June 2018 68 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 69: ...Issue 03 June 2018 69 12M 4m x 3m room ...
Страница 70: ...Issue 03 June 2018 70 12Mplus 4m x 3m room with 1m x 3m atrium ...