Issue 03 – June 2018
37
Care should be taken when attaching the door rails.
The rail will fit onto the slotted door header and door rail support . You may need to slide
the brackets on the rail to match up with the slots.
Use M5x12 Button Screws , M5 Washers
and M5 Channel T-nuts .
Insert the channel nuts into the slot already fixed
loosely to the bracket.
When you tighten the Button Screws with the
allen key, the channel nut will turn through 90 –
as you continue to tighten it will stay in position
and clamp the bracket.
Once in position, tighten the brackets to the rail with a 10mm spanner.
Hanging the door(s)
When the rail is sited hang the door from the M8
bolts fitted into the door carriage runners inside
the rail using the two metal brackets fitted to the
top of the door and tighten using a 13mm
spanner.
When the door is hung, move slowly to the
maximum desired opening position and set the
end-stop to touch the door carriage. Tighten this
in place using a 10mm spanner.
If a soft close is fitted this will need adjusting as below.
We advise fitting the Door Rail Cover and end brackets on completion of the room.
Содержание Cleanroom Kit 4M
Страница 1: ...Issue 03 June 2018 1 Cleanroom Kits ...
Страница 2: ...Issue 03 June 2018 2 Installation Guide ...
Страница 3: ...Issue 03 June 2018 3 ...
Страница 24: ...Issue 03 June 2018 24 Standard Wall Panel ...
Страница 25: ...Issue 03 June 2018 25 Door Panels ...
Страница 26: ...Issue 03 June 2018 26 Door Door is supplied fully assembled however for reference exploded view below ...
Страница 27: ...Issue 03 June 2018 27 Ceiling Assembly 4M 2m x 2m room ...
Страница 28: ...Issue 03 June 2018 28 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 29: ...Issue 03 June 2018 29 6M 3m x 2m room ...
Страница 30: ...Issue 03 June 2018 30 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 35: ...Issue 03 June 2018 35 Using CAM1000 in 9M 9M 12M 12M ...
Страница 36: ...Issue 03 June 2018 36 Top Door Runner Assembly ...
Страница 40: ...Issue 03 June 2018 40 5 ...
Страница 58: ...Issue 03 June 2018 58 6M 3m x 2m room ...
Страница 59: ...Issue 03 June 2018 59 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 60: ...Issue 03 June 2018 60 9M 3m x 3m room ...
Страница 61: ...Issue 03 June 2018 61 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 62: ...Issue 03 June 2018 62 12M 4m x 3m room ...
Страница 63: ...Issue 03 June 2018 63 12Mplus 4m x 3m room with 1m x 3m atrium ...
Страница 64: ...Issue 03 June 2018 64 Complete Cleanroom Layouts 4M 2m x 2m room 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 65: ...Issue 03 June 2018 65 6M 3m x 2m room ...
Страница 66: ...Issue 03 June 2018 66 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 67: ...Issue 03 June 2018 67 9M 3m x 3m room ...
Страница 68: ...Issue 03 June 2018 68 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 69: ...Issue 03 June 2018 69 12M 4m x 3m room ...
Страница 70: ...Issue 03 June 2018 70 12Mplus 4m x 3m room with 1m x 3m atrium ...