Issue 03 – June 2018
56
Calibration of the low-airflow alarm
1.
When the normal running fan speed has been set, note the position on the speed control
knob.
2.
Reduce the speed to the required alarm level
3.
Press and hold the Alarm Mute button for 10 seconds until single ‘beep’ is heard. Release
the button. 3 ‘beeps’ will sound indicating the alarm point has been stored.
4.
Reset the fan speed to the original level.
5.
Check operation of the low airflow alarm by reducing the speed to the alarm level. The alarm
should sound and the warning light should come on.
6.
Reset the fan speed to the original set point and repeat the procedure with all other
modules if fitted.
Maintenance
Changing the pre-filters
If the airflow monitoring system indicates a low airflow this normally indicates that the Pre-Filter/s
require changing
8.
Turn the system off
9.
Remove the thumb screws securing each of the pre-filter retaining frames.
10.
Withdraw the filters and fit a replacements
11.
Replace the retaining frame and re start the system
Replacement filter part numbers
Replacement filters are available from Monmouth Scientific:
Pre-Filters Part No:
PF-0033
2 off per unit
HEPA filter Part No:
HF-0043
1 off per unit
Содержание Cleanroom Kit 4M
Страница 1: ...Issue 03 June 2018 1 Cleanroom Kits ...
Страница 2: ...Issue 03 June 2018 2 Installation Guide ...
Страница 3: ...Issue 03 June 2018 3 ...
Страница 24: ...Issue 03 June 2018 24 Standard Wall Panel ...
Страница 25: ...Issue 03 June 2018 25 Door Panels ...
Страница 26: ...Issue 03 June 2018 26 Door Door is supplied fully assembled however for reference exploded view below ...
Страница 27: ...Issue 03 June 2018 27 Ceiling Assembly 4M 2m x 2m room ...
Страница 28: ...Issue 03 June 2018 28 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 29: ...Issue 03 June 2018 29 6M 3m x 2m room ...
Страница 30: ...Issue 03 June 2018 30 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 35: ...Issue 03 June 2018 35 Using CAM1000 in 9M 9M 12M 12M ...
Страница 36: ...Issue 03 June 2018 36 Top Door Runner Assembly ...
Страница 40: ...Issue 03 June 2018 40 5 ...
Страница 58: ...Issue 03 June 2018 58 6M 3m x 2m room ...
Страница 59: ...Issue 03 June 2018 59 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 60: ...Issue 03 June 2018 60 9M 3m x 3m room ...
Страница 61: ...Issue 03 June 2018 61 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 62: ...Issue 03 June 2018 62 12M 4m x 3m room ...
Страница 63: ...Issue 03 June 2018 63 12Mplus 4m x 3m room with 1m x 3m atrium ...
Страница 64: ...Issue 03 June 2018 64 Complete Cleanroom Layouts 4M 2m x 2m room 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 65: ...Issue 03 June 2018 65 6M 3m x 2m room ...
Страница 66: ...Issue 03 June 2018 66 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 67: ...Issue 03 June 2018 67 9M 3m x 3m room ...
Страница 68: ...Issue 03 June 2018 68 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 69: ...Issue 03 June 2018 69 12M 4m x 3m room ...
Страница 70: ...Issue 03 June 2018 70 12Mplus 4m x 3m room with 1m x 3m atrium ...