Issue 03 – June 2018
51
If you do not have an anemometer, then you will need to judge the position of speed control knob as
follows:
Knob position
Approx. Air Volume
(m³/hour)
0
0
¼ Turn
275
½ Turn
550
¾ Turn
825
Full Turn (Maximum)
1100
Maintenance
Changing the pre-filters
Regular checks should be carried out to ensure the airflow performance is maintained. Should the
module fail to achieve adequate performance, this normally indicates that the Pre-Filter/s and / or
HEPA filter require changing.
(For replacement filter part numbers, see page 5)
1.
Turn the system off and disconnect from mains.
2.
Remove the screws securing the pre-filter retaining frame.
3.
Remove the pre-filter frame and filter.
4.
Replace pre-filter with the correct type (see page 5).
5.
Replace the screws securing the pre-filter retaining frame.
6.
Reconnect the mains supply and switch on.
7.
Check the airflow and adjust if necessary (as detailed in the setup section)
Changing the HEPA filter
1.
Turn the system off and disconnect from mains.
2.
Remove the screws securing the filter retaining frame.
3.
Remove the filter frame, cover filter (if fitted) and HEPA filter.
4.
Replace HEPA filter with the correct type (see page 5).
5.
Replace cover filter and filter frame using the screws.
6.
Reconnect the mains supply and switch on.
7.
Check the airflow and adjust if necessary (as detailed in the setup section)
8.
Filter should be DOP tested to verify filter integrity and results recorded.
CAM1000 Replacement Filter Part Numbers
Replacement filters are available from Monmouth Scientific:
Pre-Filter
Part No-
PF-0081
HEPA – filter
Part No-
HF-0127
Содержание Cleanroom Kit 4M
Страница 1: ...Issue 03 June 2018 1 Cleanroom Kits ...
Страница 2: ...Issue 03 June 2018 2 Installation Guide ...
Страница 3: ...Issue 03 June 2018 3 ...
Страница 24: ...Issue 03 June 2018 24 Standard Wall Panel ...
Страница 25: ...Issue 03 June 2018 25 Door Panels ...
Страница 26: ...Issue 03 June 2018 26 Door Door is supplied fully assembled however for reference exploded view below ...
Страница 27: ...Issue 03 June 2018 27 Ceiling Assembly 4M 2m x 2m room ...
Страница 28: ...Issue 03 June 2018 28 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 29: ...Issue 03 June 2018 29 6M 3m x 2m room ...
Страница 30: ...Issue 03 June 2018 30 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 35: ...Issue 03 June 2018 35 Using CAM1000 in 9M 9M 12M 12M ...
Страница 36: ...Issue 03 June 2018 36 Top Door Runner Assembly ...
Страница 40: ...Issue 03 June 2018 40 5 ...
Страница 58: ...Issue 03 June 2018 58 6M 3m x 2m room ...
Страница 59: ...Issue 03 June 2018 59 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 60: ...Issue 03 June 2018 60 9M 3m x 3m room ...
Страница 61: ...Issue 03 June 2018 61 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 62: ...Issue 03 June 2018 62 12M 4m x 3m room ...
Страница 63: ...Issue 03 June 2018 63 12Mplus 4m x 3m room with 1m x 3m atrium ...
Страница 64: ...Issue 03 June 2018 64 Complete Cleanroom Layouts 4M 2m x 2m room 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 65: ...Issue 03 June 2018 65 6M 3m x 2m room ...
Страница 66: ...Issue 03 June 2018 66 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 67: ...Issue 03 June 2018 67 9M 3m x 3m room ...
Страница 68: ...Issue 03 June 2018 68 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 69: ...Issue 03 June 2018 69 12M 4m x 3m room ...
Страница 70: ...Issue 03 June 2018 70 12Mplus 4m x 3m room with 1m x 3m atrium ...