SpectraMax L Luminescence Microplate Reader User Guide
18
0112-0174 C
Item Name
Description
1
P-
Reagent
Connection for tubing from the P-reagent bottle. Controlled by P-injector commands in the
SoftMax Pro Software. If plate settings include both a P-injection and a M-injection, the P-
injection occurs before the M-injection.
2
M-
Reagent
Connection for tubing from the M-reagent bottle. Controlled by M-injector commands.
3
P-Wash
Connection for tubing from P-wash bottle. Washes the P-injector from injector port
through injector tip. Controlled by the P-Wash commands and automatically when you turn
the instrument off.
4
M-
Wash
Connection for tubing from M-wash bottle. Washes the M-injector from injector port
through injector tip. Controlled by the M-Wash commands and automatically when you
turn the instrument off.
Injector Ports - Base Configuration Instrument
When the instrument configuration includes four injectors, the instrument has a factory-
installed injector module on the left side. The injector module tubing is grouped into P-
reagent, M-reagent, P-wash, and M-wash bundles. Injector module tubing exits the
injector module through the rear of the instrument.
1. Before you connect the tubing, clean the wash bottles with an appropriate solvent.
2. For the base instrument configuration, connect the tubing to the P-Wash injector
port on the instrument.
3. For the base instrument configuration, connect the tubing to the M-Wash injector
port on the instrument.
4. For the base instrument configuration, connect one piece of tubing to the P-Reagent
port and the other to the M-Reagent port on the instrument.
5. Connect the waste line drain hose to the Waste port on the instrument back panel.
Place the other end of the waste line in a suitable waste container.
Note:
Make sure the waste container is in a secure location and can not spill.