![MMM Medcenter CLIMACELL 111 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/mmm-medcenter/climacell-111/climacell-111_operating-instructions-manual_1813970033.webp)
Operating instructions CLIMACELL Page 32
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm
!
0208
Heat the sensor to the temperature 130 °C (- 20 °C), the resistance measured on a functional
safety thermostat =
∞
, the resetting peg jumps out to the position OFF.
In this way the function of the safety thermostat is verified.
Clean the sensor, mount it back to the steam generator by following the reverse procedure,
reset the thermostat with the resetting peg, mount the generator into Climacell, connect the
cabinet to the mains. The cabinet is ready for operation.
5 Maintenance
5.1
Exchange of the door seal
Pull out the seal all around starting at the bottom middle.
Fit the new seal onto the folded edge of the chamber starting at the bottom middle. The seal
“clicks in“ between the chamber and the outer casing.
To check the seal take a piece of paper and put it between the door and the chamber. Pull it
out slowly, a rather strong resistance should be noticeable.
The door is adjustable at all four points:
- in the left upper part by means of bolts and nuts – sketch position 3
- in the left lower part by means of bolts and nuts – sketch position 4
- in the right upper part by means of screw with internal hexagon – sketch position 2
- in the right lower part after loosening the screw with internal hexagon adjusting in front-
back direction of the door hinge is possible – sketch position 1.
Adjust the door so that when closed the rubber sealing of the chamber would fit to the sheet
of the floating door along the whole perimeter. To check it up place a sheet of paper between
the sealing and the metal sheet of the floating door before it is closed, it is possible to take
the paper out against a small resistance.