Setting up the unit
24
Installation instructions
Floor with steam barrier
In the case of floors with a steam barrier, the floor plates are not
screwed to the floor but glued with the enclosed adhesive.
a
b
d
c
e
A
B
Image: A: Position of the floor plate; B: Floor plate glued to the floor
a Cap nut
d Floor plate
b Holding plate
e Equipment leg
c Stud bolt
Requirement
The floor must be capable of taking the weight of the unit
The floor must be clean and suitable for the type of fastening
The unit is set up and levelled in accordance with the planning
drawing
1. Insert the base plate of the fastening set into the holding plate in
accordance with the drawing.
2. Screw the cap nuts on hand-tight.
3. Align the floor fastening in accordance with the drawing in position
1-1 or 2-2 on the equipment leg or base frame and then mark it on
the floor.
4. Unscrew the cap nuts and remove the holding plate from the base
plate.
5. Fasten the base plates to the floor with the enclosed adhesive.
Note the manufacturer's instructions for the adhesive.
Apply the adhesive in accordance with the manufacturer's
instructions.
Observe the drying time in accordance with the manufacturer's
instructions.
6. Put the holding plate onto the base plates and fasten with the cap
nuts.
7. Fill out the Commissioning report.
4127002--0AIBE-C