3 Installation onto the Machine Main Unit
No. 99MBE048B
Installation using the scale retaining springs
1
Temporarily fix the center of the main scale with the scale retaining spring A.
Scale retaining spring A
Scale retaining spring B
Scale retaining spring B
2
Temporarily fix the main scale with the scale retaining springs B.
This must be performed in the order closer to the center of the main scale.
3
Conduct temperature leveling for 1 to 2 hours.
4
Fully tighten the bolts for scale retaining springs in the order from the center to both ends of the main
scale.
The recommended tightening torque for scale retaining spring bolts is 1.5 N•m.