3
1 Overview
No. 99MBE048B
1.3
The Flow of Main Tasks
The following chart shows the flow of preliminary preparation and installation onto the machine main
unit as tasks to use this product.
Preliminary preparation
Checking the Equipment Model
"2.1 Checking the Equipment Model" (page 5)
Designing the Scale Mounting
Surface
"2.2 Designing the Scale Mounting Surface"
Designing the Detector Bracket
"2.3 Designing the Detector Bracket" (page 10)
Installation onto the machine main unit
Checking the Package Contents
"3.1 Checking the Package Contents" (page 11)
Mounting the Scale
"3.2 Mounting the Scale" (page 12)
Mounting the Detector Bracket
and Detector
"3.3 Mounting the Detector Bracket and Detector"
Connecting the Feedback Cable
"3.4 Connecting the Feedback Cable" (page 16)
Adjusting the Detector Signals
"3.5 Adjusting the Detector Signals" (page 17)
Handling the Cables and
Checking the Mounting State
Содержание ST36
Страница 14: ...4 1 Overview No 99MBE048B MEMO...
Страница 36: ...26 3 Installation onto the Machine Main Unit No 99MBE048B MEMO...
Страница 56: ...46 4 Specifications No 99MBE048B MEMO...
Страница 58: ...48 5 Troubleshooting No 99MBE048B MEMO...