-
76
-
(10) Outline of dehumidifying operation
(a)
After operating the indoor blower for 20 seconds from immediately after the start of operation, the indoor temperature is checked
and, based on the result of check, the cooling oriented dehumidifying or heating oriented dehumidifying is selected.
Heating oriented dehumidifying
Cooling oriented dehumidifying
Low
–3
High
Room temperature - Setting temperature (deg)
Cooling or heating oriented dehumidifying is selected again one hour after the first selection of the cooling or heating oriented
dehumidifying.
Operation range
(b)
Outline of control
(i)
Cooling oriented dehumidifying
Room temperature and relative humidity is checked at 5-minute intervals after selecting the cooling or heating oriented
dehumidifying in order to determine the operation range.
Low
–1
0
+2
High
Room temperature – Setting temperature (deg)
High humidity regions
I
(I)
F
(F)
E
(F)
D
(E)
Low humidity regions
C
(C)
B
(C)
A
(B)
Note (1)
Figures in the parentheses
( ) show the values at
ECONOMY operation.
• Humidity sensor’s set values
55
70
Relative humidity (%)
High humidity regions
Low humidity regions
Determination of cooling
oriented dehumidifying
operation range
Operation pattern
Inverter command speed
(rps)
Indoor fan motor
Outdoor fan motor
30
4th speed
4th speed
5min.
22
2nd speed
3rd speed
5min.
12
2nd speed
3rd speed
5min.
30
3rd speed
4th speed
5min.
16
2nd speed
3rd speed
5min.
25sec.
40
5min.
4th speed
5th speed
0
1st speed
OFF
OFF
5min.
Temperature and humidity check
A
range
B
range
C
range
D
range
E
range
F
range
I
range
Содержание SRK10CES
Страница 2: ...TECHNICAL MANUAL...
Страница 204: ...202 MEMO...
Страница 208: ...CRAE0171 10 11 12 13 20 21 24 22 23 25 17 18 16 14 15 19 7 8 6 5 1 9 2 4 3 HEAT EXCH CONTROL 206...
Страница 213: ...211...
Страница 214: ...CRAE0168 21 1 9 3 8 7 6 5 4 2 23 11 10 13 17 12 15 14 16 18 19 20 22 24 25 26 27 29 28 HEAT EXCH CONTROL 212...
Страница 218: ...CRAE0141 1 4 5 6 7 8 10 11 12 13 14 15 19 20 21 25 26 23 24 22 16 9 2 3 18 17 HEAT EXCH CONTROL 216...
Страница 222: ...CRAE0141 1 4 5 6 7 8 10 11 12 13 14 15 19 20 21 25 26 23 24 22 16 9 2 3 18 17 HEAT EXCH CONTROL 220...
Страница 227: ...225...
Страница 228: ...CRAE0166 21 1 9 3 8 7 6 5 4 23 11 2 10 13 17 12 15 14 16 18 19 20 22 24 25 26 27 29 28 HEAT EXCH CONTROL 226...
Страница 233: ...231...
Страница 234: ...CRAE0166 21 1 9 3 8 7 6 5 4 23 11 2 10 13 17 12 15 14 16 18 19 20 22 24 25 26 27 29 28 HEAT EXCH CONTROL 232...
Страница 236: ...CRBE0226 1 3 4 2 5 6 7 8 9 10 11 12 13 PANEL FAN ASSY 234...
Страница 240: ...05 0 CRBE0207 2 12 6 1 7 14 3 24 16 19 4 9 10 5 11 11 13 15 8 18 17 20 23 21 22 PANEL FAN ASSY 238...
Страница 244: ...CRBE0228 9 15 7 8 1 2 4 5 6 12 13 14 10 11 3 PANEL FAN ASSY 242...
Страница 246: ...CRBE0190 1 2 4 3 5 6 7 8 13 10 14 15 12 11 9 GAS LIQ 18 19 20 17 21 16 CONTROL ASSY HEAT EXCH CONTROL 244...
Страница 248: ...CRBE0227 11 15 16 1 2 3 5 6 7 8 9 12 13 14 4 10 PANEL FAN ASSY 246...
Страница 250: ...CRBE0191 1 3 4 5 2 6 7 8 10 13 9 12 11 15 14 LIQ GAS CONTROL ASSY 17 18 16 HEAT EXCH CONTROL 248...
Страница 252: ...CRBE0221 12 16 17 1 2 3 5 6 7 8 9 10 13 16 14 15 4 11 PANEL FAN ASSY 250...
Страница 256: ...05 0 CRBE0224 2 1 5 16 3 9 11 12 4 7 8 6 6 17 17 10 13 15 14 PANEL FAN ASSY 254...
Страница 260: ...2005 ROOM AIR CONDITIONING TECHNICAL HANDBOOK...