-
10
-
After lifting the hoist, loosen the nut once with no load. After that, eliminate the gap between the
clamping bolt and the frame bolt hole, and then tighten the nut again.
If there is a gap between the clamping bolt and the frame bolt hole, the wheel may be lifted, or the
hoist main body may be inclined.
Wheel
Box Rail
With flange
Содержание UM 10t
Страница 51: ... 47 Structural Drawing of Hoist Main Body 5t 10t PA00531 ...
Страница 52: ... 48 Structural Drawing of Electric Traversing Unit Monorail Type 10t P288922 ...
Страница 53: ... 49 Structural Drawing of Electric Traversing Unit Double rail type 5t PA00483 ...
Страница 54: ... 50 Structural Drawing of Traversing Mortor Double rail type 10t P276926 ...
Страница 55: ... 51 Structural Drawing of Hook Block 5t PG49975 ...
Страница 56: ... 52 Structural Drawing of Hook Block 10t PG49976 ...
Страница 60: ...MITSUBISHI ELECTRIC FA INDUSTRIAL PRODUCTS CORPORATION Specifications subject to change without notice ...