67
OPERATING PROCEDURE
PHOTOS&ILLUSTRATIONS
8. Removing the drain pan
(1) Remove the panel.
(2) Remove the fan guard.
(3) Remove the bell mouth.
(4) Remove the electrical box.
(5) Remove the 3 screws each of the corner supports A,B
and C.(Inner screws:M4)
(6) Remove the corner supports A,B, and C.
(7) Pull out the drain pan gradually with care not to crack it.
9. Removing the heat exchanger
(1) Remove the panel.
(2) Remove the fan guard.
(3) Remove the bell mouth.
(4) Remove the turbo fan.
(5) Remove the electrical box.
(6) Remove the drain pan.
(7) Remove the heater and the heater support.
(8) Remove the coil support A and B.
(9) Remove the coil set screw.
(10) Remove the 4 screws of the pipe cover on the outer wall.
(11) Remove the 2 pipe covers.
(12) Remove the pipe band screw.
(13) Remove the 4 screws of coil on the outer wall.
Photo 10
7. Removing the panel
(1) Disconnect the connector.
(2) Remove 2 of 4 screws of the panel, and loosen the other
2 screws.
(3) Slide the panel slightly to remove it.
Photo 9
Photo 11
Corner support A
Corner
support C
Corner
support B
Remove screws
Remove screws
Remove screws
Remove
Screws
Photo 12
Coil set screw
Coil
support B
Coil set
screw on
outer wall
Pipe band screw
Panel set screws
Connector
Pipe cover set screw
Coil set screw
on outer wall
Coil
support A
Содержание PLH Series
Страница 2: ......