Confirming the operation
2-15
2.3.1 Installing the teaching pendant (T/B)
Installing the T/B, with turning off the controller power.
Please do not pull the cable of T/B strongly or do not bend it too much.
It becomes the breaking of a wire of the cable and the cause of breakage of the
connector. Please installing so that stress does not start the cable with the con-
nector itself.
Explain the installation method of T/B below.
1) Check that the controller's power supply is OFF.
2) Refer to
and connect T/B connector to the robot controller.
Use as the upper surface the lock lever, and push in until there is sound.
3) Pressing down the lock lever to lock the connector as shown below.
Fig. 2-7: Installing the T/B
2.3.2 Turning ON the control power
Confirm that there are no operators near the robot before turning the power ON.
1) Turn the controller power switch ON.
Turns ON the switch of the earth leakage breaker of installation outside.
CAUTION
A
Lock lever
TB connector
Teaching pendant (T/B)
T/B connection connector
Details of A section
Pressing down the lock lever to
lock the connector.
CAUTION