4
2.INSTALLATION
2.1 Pre-Installation Instructions
Make sure that the input power of the inverter is off.
2.2 Setting the Station Numbers and Terminating Resistor
With input power on, do not install or remove the option unit. Otherwise, the inverter and
option unit may be damaged.
REMARKS
Refer to page 10 for the FR-V5NSCBL (SSCNET cable).
CAUTION
Motion
controller
Q172CPU
FR-V5NS
Setting: 0
IN
OUT
0
1
2
3
4
98
7
5
6
A
B
C
D
E
F
150
Ω
OPEN
150
Ω
OPEN
FR-V5NS
Setting: 1
IN
OUT
0
1
2
3
4
98
7
5
6
A
B
C
D
E
F
150
Ω
OPEN
150
Ω
OPEN
FR-V5NS
Setting: 2
IN
OUT
0
1
2
3
4
98
7
5
6
A
B
C
D
E
F
150
Ω
OPEN
150
Ω
OPEN
FR-V5NSCBL_
FR-V5NSCBL_
FR-V5NSCBL_
(first axis)
(second axis)
(third axis)
(Terminating resistor
present (150
Ω
))
Содержание FR-V5NS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......