background image

4

2.INSTALLATION

2.1 Pre-Installation Instructions

Make sure that the input power of the inverter is off.

2.2 Setting the Station Numbers and Terminating Resistor

With input power on, do not install or remove the option unit. Otherwise, the inverter and 
option unit may be damaged.

REMARKS

Refer to page 10 for the FR-V5NSCBL (SSCNET cable).

CAUTION

Motion 
controller
Q172CPU

FR-V5NS

Setting: 0

IN

OUT

0

1

2

3

4

98

7

5

6

A

B

C

D

E

F

150

OPEN

150

OPEN

FR-V5NS

Setting: 1

IN

OUT

0

1

2

3

4

98

7

5

6

A

B

C

D

E

F

150

OPEN

150

OPEN

FR-V5NS

Setting: 2

IN

OUT

0

1

2

3

4

98

7

5

6

A

B

C

D

E

F

150

OPEN

150

OPEN

FR-V5NSCBL_

FR-V5NSCBL_

FR-V5NSCBL_

(first axis)

(second axis)

(third axis)

(Terminating resistor 
     present (150

))

Содержание FR-V5NS

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Отзывы: