CONTENTS
1.PRE-OPERATION INSTRUCTIONS
1
1.1
Unpacking and Product Confirmation ..................................................................................................1
1.2
Packing Confirmation...........................................................................................................................1
1.3
Caution.................................................................................................................................................1
1.4
Structure ..............................................................................................................................................2
1.5
Operation Overview .............................................................................................................................3
2.INSTALLATION
4
2.1
Pre-Installation Instructions..................................................................................................................4
2.2
Setting the Station Numbers and Terminating Resistor.......................................................................4
2.2.1
Setting the station numbers ..........................................................................................................5
2.2.2
Setting the terminating resistor .....................................................................................................6
2.3
Installation and Removal......................................................................................................................7
3. WIRING
8
3.1
Wiring Example....................................................................................................................................8
3.2
Connection Example............................................................................................................................9
3.3
SSCNET Cables and Ground Cable..................................................................................................10
3.4
Wiring Route ......................................................................................................................................11
4. SSCNET COMMUNICATION STATUS
12
5. INITIAL COMMUNICATION SETTING FROM MOTION CONTROLLER
13
6. INVERTER SETTINGS AND INDICATIONS
14
6.1
Operation Mode Switchover...............................................................................................................14
6.2
Initial Communication Waiting Status ("CF" alarm)............................................................................15
Содержание FR-V5NS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......