(12) Control at initial starting
• The following initial start mode will be performed when the unit is started for the first time after the power has
been turned on.
<Flow chart of initial start mode>
Start of initial operation mode
Initial operation mode is finished.
Step 1
•
•
The compressor operated at F
≤
38Hz.
–
–
Finished operating time reaches 5 minutes.
Step 2
•
•
The compressor is operated at less than or equal
to F
≤
60Hz.
Operates continuously for 20 minutes and finishes.
- 60 -