[2] Test Run Method
Operation procedure
1
Turn on universal power supply at least 12 hours before getting started
Displaying “HO” on display panel for
about two minutes
2
Press
TEST RUN
button twice
Displaying “TEST RUN’’ on display panel
3
Press
selection button
Make sure that air is blowing out
4
Press
select button to change from cooling to heating operation, and vice versa
Make sure that
warm or cold air is blowing out
5
Press
adjust button
Make sure that air blow is changed
6
Press
or
button to change wind
Make sure that horizontal or downward blow is adjustable.
7
Make sure that indoor unit fans operate normally
8
Make sure that interlocking devices such as ventilator operate normally if any
9
Press
ON/OFF
button to cancel test run
Stop operation
Note 1: If check code is displayed on remote controller or remote controller does not operate normally.
2: Test run automatically stops operating after two hours by activation of timer set to two hours.
3: During test run, test run remaining time is displayed on time display section.
4: During test run, temperature of liquid pipe in indoor unit is displayed on remote controller room temperature
display section.
5: When pressing
adjust button, depending on the model, “NOT AVAILABLE” may be displayed on remote
controller. However, it is not a malfunction.
6: When pressing
or
button, depending on the model, “NOT AVAILABLE” may be displayed on
remote controller. However, it is not a malfunction.
- 47 -
Содержание CITY MULTI CMB-P1016V-F
Страница 17: ...FANCON board CNFAN CNPOW CNFC2 CN15V1 CNDR1 CNIPM1 G A board Terminal for signal grounding CNDC1 CNDC2 16 ...
Страница 18: ... 17 RELAY 10 board RELAY 4 board ...
Страница 19: ... 18 BC controller SW4 SW5 SW2 SW1 CN12 Power supply 1 EARTH 3 N 5 L CN02 M NET transmission CN03 CNTR ...
Страница 72: ... 71 ...