- 45 -
(5)
Check points for system structure
ex. PURY-P200YEM-A
Check points from installation work to test run.
Trouble
Not operate.
Not cool (at cooling).
Not heat (at heating).
Not cool, not heat, error stop.
Condensation drip in piping.
Not cool, not heat, error stop.
Water leak, condensation drip in drain piping.
Error stop, not operate.
Electric shock.
Error stop, not operate.
Some electric parts should be damaged.
Classification
Installation and
piping
Power source
wiring
Portion
1
2
3
4
5
6
7
8
1
2
3
4
Check item
Instruction for selecting combination of outdoor unit,
and indoor unit followed? (Maximum number of indoor
units which can be connected, connecting model name,
and total capacity.)
Follow limitation of refrigerant piping length? For ex-
ample, 80m or less (total length : 240m) at the farthest.
Connecting piping size of branch piping correct?
Refrigerant piping diameter correct?
Refrigerant leak generated at connection?
Insulation work for piping properly done?
Specified amount of refrigerant replenished?
Pitch and insulation work for drain piping properly done?
Specified switch capacity and wiring diameter of main
power source used?
Proper grounding work done on outdoor unit?
The phases of the L line (L1, L2, L3) correct?
L line and N line connected correct?
Содержание CITY MULTI CMB-P1016V-F
Страница 17: ...FANCON board CNFAN CNPOW CNFC2 CN15V1 CNDR1 CNIPM1 G A board Terminal for signal grounding CNDC1 CNDC2 16 ...
Страница 18: ... 17 RELAY 10 board RELAY 4 board ...
Страница 19: ... 18 BC controller SW4 SW5 SW2 SW1 CN12 Power supply 1 EARTH 3 N 5 L CN02 M NET transmission CN03 CNTR ...
Страница 72: ... 71 ...