TEST RUN
[1] Before Test Run
(1)
Check points before test run
1
Neither refrigerant leak nor loose power source/ transmission lines should be found.
2
Confirm that the resistance between the power source terminal block and the ground exceeds 2M
Ω
by measur-
ing it with a DC500V megger. Do not run if it is lower than 2M
Ω
.
Note) Never apply the megger to the MAIN board. If applied, the MAIN board will be broken.
3
Confirm that the Ball valve at both gas and liquid sides is being fully opened.
Note) Certainly close the cap.
4
5
Be sure that the cr
Prior to Ver.E
The number of indoor units and the total number of remote controllers id displayed within the parenthesis ( ).
16 (32)
16 (32)
200 or lower
200 or higher
After Ver.F
20 (40)
16 (32)
(
❇
1)
Capability of the
connected indoor units
Number of connected indoor units that
can be connected without a RP.
Remote controller type
Remote controller PAR-F 25MA
ankcase heater has been powered by turning the main power source on at least 12 hours
before starting the test run. The shorter powering time causes compressor trouble.
(2)
Caution at inverter check
Because the inverter power portion in outdoor unit electrical part box have a lot of high voltage portion, be sure to follow
the instructions shown below.
During energizing power source, never touch inverter power portion because high voltage (approx. 580V) is
applied to inverter power portion.
When checking,
Shut off main power source, and check it with tester, etc.
Allow 10 minutes after shutting off main power source.
Open the MAIN board mounting panel, and check whether voltage of both ends of electrolytic capacitor is
20V or less.
1
2
1
2
3
If any of the power supply wires (L1, L2, L3, N, ) are mistakenly connected, it is possible to damage the unit.
Please exercise caution.
6
A transmission booster (RP) is required when the number of connected indoor unit models in a cooling system
exceeds the number of models specified in the chart below.
Note: The maximum number of units that can be controlled is determined by the indoor unit model, the type of
remote controller and their capabilities.
(
❇
1) If even one unit that is higher than 200 exists in the cooling system, the maximum capacity will be “200 or
higher”.
❇
Please refer to the installation manual for more details.
❇
Before turning power on to the outdoor unit, first turn on the transmission booster. (If the outdoor unit are mistakenly
turned on first, turn on the transmission booster and then reset the outdoor unit power.)
- 43 -
Содержание CITY MULTI CMB-P1016V-F
Страница 17: ...FANCON board CNFAN CNPOW CNFC2 CN15V1 CNDR1 CNIPM1 G A board Terminal for signal grounding CNDC1 CNDC2 16 ...
Страница 18: ... 17 RELAY 10 board RELAY 4 board ...
Страница 19: ... 18 BC controller SW4 SW5 SW2 SW1 CN12 Power supply 1 EARTH 3 N 5 L CN02 M NET transmission CN03 CNTR ...
Страница 72: ... 71 ...