
4
4-2.
Relay Box
(1) Sensor connectors CH1 to CH8
Allows up to eight sensors to be connected. Only our dedicayed sensors are supported.
(2) Relay cable
Connects to the sensor connection D-sub connector on the amplifier. The cable is 2 m long and is
connected directly to the relay box.
(3) Magnetic sheet
Used to secure the relay box to the surface on which it is to be installed. For further details, see "1.
Installation location" in "Safety Precautions".
(4) Mounting plates
Can be attached to the relay box to screw-mount it. (Four M3 tapped holes must be drilled in the
mounting surface.)
For further details, see "1. Installation location" in "Safety Precautions".
CAUTION
If using the magnetic sheet to mount the relay box, do not attach the mounting plates as well, as these
will prevent proper contact between the magnetic sheet and the mounting surface and full magnetic
attraction will not be achieved.
(3) Magnetic sheet
(2) Relay cable
Sensor connectors CH1 to CH8
(4) Mounting plates
Содержание MPC-201-25
Страница 1: ...Molding Pressure Conversion Module MPC 201 25 Instruction Manual EN294 1697G ...
Страница 2: ......
Страница 14: ...XII ...
Страница 18: ...XVI 24 4 Vertically positioning the ejector plate 102 24 5 Removing a sensor 103 ...
Страница 33: ...15 3 Right click to display the context menu and select Properties ...
Страница 34: ...16 4 Click on Update Driver in the Driver tab 5 Select Browse my computer for driver software ...
Страница 43: ...25 5 Overlay screen 6 Trend Peak Pressure screen 7 Trend Integral screen ...
Страница 54: ...36 Reset scale 1 Right click on the graph to be reset to its original scale 2 Click to select Reset scale ...
Страница 122: ......
Страница 123: ......