5-8
2
Connect the thicker end of the new tube to the inlet metal tube and then guide
the tube through the deflection tube.
BIOHAZARD
When replacing the pump tubing, wear gloves and lab coat and, if
necessary, goggles. In case your skin contacts the waste, follow
standard laboratory safety procedure and consult a doctor.
NOTE
After replacement is completed, please make sure that the flow cell is
pressed to the bottom of the installation hole (the top of the flow cell
should be on the same level with the installation surface). Otherwise
the test result might not be reliable.
NOTE
When connecting the tube, the tube should reach the root of the metal
tube to ensure reliability.
After the aspiration tubing is installed, the bending part should be
transitioned smoothly, no sharp angle, corrugation is allowed
5.3.6 Replacing
Lamp
When the system warns that the background is too weak (no bubble in the flow cell)
and the warning can not be dealt with by cleaning the flow cell, the optical element
and adjusting the photoelectric gain. The detailed operation is as follows:
Aspiration
deflection
tube
The thicker
end is
connected
with the metal
tube
Содержание BA-88A
Страница 1: ...BA 88A Semi auto Chemistry Analyzer Operation Manual...
Страница 2: ......
Страница 6: ......
Страница 18: ......
Страница 21: ...III Appendix C External Printer C 1 Appendix D Supplies D 1...
Страница 22: ......
Страница 28: ......
Страница 78: ......
Страница 96: ......
Страница 102: ......
Страница 104: ......
Страница 106: ......
Страница 107: ...P N BA89 20 87038 1 0...