Moisture plus
71
The prompt to draw in water then
appears.
Preparing and starting the water
intake process
Fill a suitable container with the
required amount of fresh tap water.
Open the door.
Pull the water intake pipe forwards
(located below the control panel on
the left).
Immerse the end of the water intake
pipe in the container with the tap
water.
Confirm with
OK
.
The water intake process will begin.
The amount of water actually drawn up
into the oven may be less than the
amount specified as required, leaving a
small amount in the container.
You can interrupt and resume the
intake process at any time by
selecting
Stop
or
Start
.
Remove the water container after the
water intake process and close the
door.
The sound of the pump running can be
heard again briefly. Residual water in
the water intake pipe is being drawn
into the oven.
The oven heating and cooling fan will
switch on. The required and the actual
temperature will appear.
You will see the temperature increasing.
A buzzer will sound when the set
temperature is reached for the first time.
If you have selected
with timer
, you can
check the time before steam is
released by selecting
Info
.