M
‑
I SWACO
MONGOOSE PRO Shale Shaker
31
Field Installation and Operation Manual 9092F02001AENG (D)
31
15.3
Handling Screens
MONGOOSE PRO units have four pretensioned screens and ten wedges per shaker basket (two are spares on the
cable tower). Once screens are placed on the screen bed, wedges are driven between each screen edge and support
bars on shaker sidewalls. The screen bed is slightly crowned at the center causing screen frames to bow when
wedges are forced in place. This prevents screens from “whipping” up and down during shaker operation.
15.3.1
Removing Screens
1.
Initiate a controlled shutdown of the equipment.
WARNING
PERFORM LOCKOUT / TAG OUT PROCEDURES TO ISOLATE THE UNIT FROM RIG
POWER SUPPLY.
TIP
WASH DOWN THE SCREEN AREA PRIOR TO INSTALLING NEW SHAKER SCREENS.
TIP
USE A RUBBER MALLET TO AVOID DAMAGING THE SCREEN WEDGES.
2.
Each screen is secured in place by two wedges, one per side.
3.
Strike top handle section of wedges to loosen them.
a.
Always remove wedges with a dead blow hammer (Refer to Figure 26 for an alternative technique).
4.
Remove screen panel. Screen panels are removed and installed one at a time.
a.
Place the screen wedges in the wedge holders, located on the cable tower, to prevent losing them during
screen changes (Refer to Figure 27).
5.
Examine screen deck gaskets for aggressive wear.
TIP
REPLACE ANY DECK GASKETS THAT ARE WORN, CRACKED, OR HARDENED.