MONGOOSE PRO Shale Shaker
23
Field Installation and Operation Manual 9092F02001AENG (D)
23
12.
STARTING EQUIPMENT
The list below explains checks necessary to startup the equipment:
WARNING
REMOVE SHIPPING BRACKETS BEFORE TURNING ON POWER TO THE SHALE
SHAKER. FAILURE TO COMPLY WILL RESULT IN DAMAGE TO EQUIPMENT AND CAN
CAUSE SERIOUS INJURY FROM FLYING OBJECTS.
KEEP ALL GUARDS IN PLACE AT ALL TIMES TO AVOID EXPOSURE TO ROTATING
PARTS. WHILE POWER IS ON, SEVERE INJURY CAN OCCUR IF HANDS OR FEET
REACH INSIDE THE EQUIPMENT.
TIP
MAKE SURE ALL OBJECTS, SUCH AS TOOLS AND COMPONENT PARTS, ARE CLEAR
FROM THE EQUIPMENT BEFORE STARTING THE UNIT.
NOTE
READ ALL OF THE INSTRUCTIONS IN THIS PARAGRAPH PRIOR TO OPERATION OF
THE EQUIPMENT. IMPROPER INSTALLATION, MAINTENANCE, OR OPERATIONS
MAY CAUSE PERSONAL INJURY OR MACHINE FAILURE.
12.1
Pre-Start Checklist
WARNING
THE FOLLOWING STEP REQUIRES INTERACTING WITH EQUIPMENT THAT
PRESENTS POTENTIAL PINCH POINTS FOR OPERATORS. KEEP ALL LIMBS FREE
OF SCREENS AND USE VALVE LOCKOUTS.
•
Make sure the shaker decks have screens loaded and secured to the basket (Refer to Figure 24). Consult
paragraph 15.3.2 for screen installation steps.
•
Make sure the Shale Shaker has power to the control panel and motors.
•
Make sure the fluid connections to the feeder are secure.
•
Make sure the discharge locations are appropriately routed.
Figure 24. Screens & Wedges Firmly Engaged