M
‑
I SWACO
MONGOOSE PRO Shale Shaker
28
Field Installation and Operation Manual 9092F02001AENG (D)
28
•
System pressure malfunction
o
Shut down operation and examine air/hydraulic lines for leaks or damage.
•
Deck adjustment elevator failure
o
Shut down operation and diagnose deck adjustment system, repairing or replacing as
necessary
14.
STOPPING / SHUTDOWN
The following procedures explain how to shut down the MONGOOSE PRO.
14.1
Controlled Shutdown of the Equipment for Routine Maintenance
1.
Stop flow of drilling fluid to shaker.
2.
While shaker is running, wash down screens, thoroughly cleaning all cuttings and solids build up around inside
of deck and wedges, using an appropriate base fluid.
3.
Push STOP button on the Start/Stop station to shut down shaker.
CAUTION
FOLLOW ALL SAFETY INSTRUCTIONS. USE PROPER PPE WHEN USING STEAM OR
PRESSURE EQUIPMENT.
TIP
DO NOT USE A SQUEEGEE OR ANY OTHER FOREIGN OBJECT TO CLEAN
SCREENS.
NOTE
IF UNIT IS OUT OF SERVICE FOR AN EXTENDED PERIOD, THOROUGHLY CLEAN
AND DRY SHAKER SCREENS. REPLACE IN THEIR BOXES OR STORE ALL SCREENS
IN A SAFE, DRY AREA.