MAINTAINING EQUIPMENT
15.1
Safety Related Maintenance Procedures
The following procedures explain basic tasks that will help extend the service life of the MONGOOSE PRO
Shale Shaker. M
‑
I SWACO recommends operators comply with these procedures to ensure the unit operates at its
peak efficiency and in a safe manner.
WARNING
INITIATE A CONTROLLED SHUTDOWN BEFORE STARTING ANY PARTS
REPLACEMENT PROCEDURE. LOCKOUT / TAG OUT THE UNIT. HAVE A CERTIFIED
ELECTRICIAN VERIFY THAT THE POWER SUPPLIES ARE ISOLATED BEFORE
PERFORMING ANY MAINTENANCE PROCEDURE ON THE SHALE SHAKER.
Below are some basic safety-related procedures that must be followed when performing maintenance:
•
Clean all parts and work area.
•
Block up and secure heavy parts before working beneath an assembly or a component of an assembly.
•
Always seek assistance when heavy lifting is required.
•
Remove all screens BEFORE any work is performed on the shaker.
•
Make sure all tools and old parts, such as nuts and bolts or washers, are removed BEFORE restarting the
Shale Shaker.
•
Do NOT weld on any part of the basket assembly for any reason.
•
All maintenance is to be carried out by qualified personnel.