6. Assembly
ThermiStar L .. SP 01/03/10
56
Motor control unitRSHR 4025
for ThermiStar L 28
Fig. 33:
Operational diagram RSHR 4025
Legend for Fig. 33:
Abbr.
Meaning
1
Set warm-up time to value 1
2
Set cool-off time to value 0
3
Set warm-up torque to 25%
LED indications
Meaning
LED, green (continuous)
Status indicator LEDs Power
supply ON
LED, yellow (flashing)
Ramping
LED, yellow (continuous)
Bypass relay ON
- LED, red (flashing)
- LED, red (continuous)
Over-temperature alarm
- Device alarm
- Motor alarm PTC-sensor
LED, red (flashing)
Wrong phase sequence*
- LED, red (flashing at 4Hz)
- LED, red (flashing at 1.3Hz)
Phase loss
- Phase loss alarm*
- Under voltage alarm
* Detection of these alarm conditions is made during power-up of
the device
Controller and control unit
At this point, MHG refers to the Assembly-Operation-Maintenance
manual RVS 61.843 / AVS 37.. / QAA 75.. / QAA 78..
(Part No. 98.18803-6105)
Содержание 98.30000-6324
Страница 1: ...ThermiStar L SP 01 03 10 ...
Страница 18: ...5 Technical Data ThermiStar L SP 01 03 10 18 5 2 Type plate Fig 4 Sample type plate ...
Страница 21: ...ThermiStar L SP 01 03 10 5 Technical Data 21 ...
Страница 39: ...ThermiStar L SP 01 03 10 6 Assembly 39 Fig 11 Sensor cable heat source intake 5 ...
Страница 68: ...8 Maintenance ThermiStar L SP 01 03 10 68 8 4 Spare part drawing and legend Fig 40 ...
Страница 88: ...Your notes ThermiStar L SP 01 03 10 88 ...
Страница 89: ...ThermiStar L SP 01 03 10 Your notes 89 ...
Страница 90: ...Your notes ThermiStar L SP 01 03 10 90 ...
Страница 92: ......