6. Assembly
ThermiStar L .. SP 01/03/10
40
Installation of the heat pump
The heat pump is delivered standing on a wooden pallet.
Remove the foil/packaging and install the heating pump in accor-
dance with the following steps.
Fig. 12:
Heating pump without enclosure
Fig. 13:
Place the heat pump with the pallet next to the actual
erection location. Loosen the transport braces
1
(marked in red) on the base plate of the heat pump and
lift the latter to the final erection site.
Содержание 98.30000-6324
Страница 1: ...ThermiStar L SP 01 03 10 ...
Страница 18: ...5 Technical Data ThermiStar L SP 01 03 10 18 5 2 Type plate Fig 4 Sample type plate ...
Страница 21: ...ThermiStar L SP 01 03 10 5 Technical Data 21 ...
Страница 39: ...ThermiStar L SP 01 03 10 6 Assembly 39 Fig 11 Sensor cable heat source intake 5 ...
Страница 68: ...8 Maintenance ThermiStar L SP 01 03 10 68 8 4 Spare part drawing and legend Fig 40 ...
Страница 88: ...Your notes ThermiStar L SP 01 03 10 88 ...
Страница 89: ...ThermiStar L SP 01 03 10 Your notes 89 ...
Страница 90: ...Your notes ThermiStar L SP 01 03 10 90 ...
Страница 92: ......