6. Assembly
ThermiStar L .. SP 01/03/10
44
Fig. 16:
Heat pump connections
Legend for Fig. 16:
Abbr.
Meaning
1
Fluid line
2
Suction gas line
3
Hot-gas line
-
Evacuate the suction, liquid and hot-gas lines. Connect the
devices to the Schrader valves for evacuation (see Fig. 10).
-
After the evacuation has been completed, open the ball valves to
allow the refrigerant to distribute. The system is operational after
the electrical installation has been made.
Содержание 98.30000-6324
Страница 1: ...ThermiStar L SP 01 03 10 ...
Страница 18: ...5 Technical Data ThermiStar L SP 01 03 10 18 5 2 Type plate Fig 4 Sample type plate ...
Страница 21: ...ThermiStar L SP 01 03 10 5 Technical Data 21 ...
Страница 39: ...ThermiStar L SP 01 03 10 6 Assembly 39 Fig 11 Sensor cable heat source intake 5 ...
Страница 68: ...8 Maintenance ThermiStar L SP 01 03 10 68 8 4 Spare part drawing and legend Fig 40 ...
Страница 88: ...Your notes ThermiStar L SP 01 03 10 88 ...
Страница 89: ...ThermiStar L SP 01 03 10 Your notes 89 ...
Страница 90: ...Your notes ThermiStar L SP 01 03 10 90 ...
Страница 92: ......