Revision 8.6
SECTION 5 : COMMISSIONING
69
SECTION 5 : COMMISSIONING
5.1
GENERAL
Commissioning of the THYROMAT is simplified by default parameters displayed on the control panel
(e.g. the operating functions during the functional testing phase of the commissioning process).
Equipment configuration and operational adjustments in the event of unique applications are finalised
when commissioning the equipment.
It is important to observe the warnings and cautions before commencing with the commissioning
procedure.
5.2
PREPARATION
WARNINGS
1. HIGH VOLTAGE COMPONENTS, ACCIDENTAL
CONTACT WITH THYRISTOR STACKS CAN
RESULT IN FATAL INJURIES.
2. ONCE CONNECTED TO THE MAINS SUPPLY,
ALL INTERNAL COMPONENTS OF THE
CONTROL UNIT (EXCEPT ISOLATED I/O
TERMINALS) ARE AT MAINS POTENTIAL.
3. WHEN
THE
THREE-PHASE
SUPPLY
IS
CONNECTED TO THE THYRISTOR STACK
AND MOTOR (CONNECTIONS U. V AND W)
THE THYRISTOR STACK IS CONTINUALLY
LIVE EVEN THOUGH THE MOTOR IS NOT
RUNNING.
4. DO
NOT
ATTEMPT
TO
MAKE
ANY
CONNECTIONS TO THE THYROMAT WHILE IT
IS CONNECTED TO THE MAINS POWER.
5. AFTER DISCONNECTING THE MAINS POWER
USE A MULTI-METER TO MAKE SURE THAT
THERE IS NO SUPPLY VOLTAGE PRESENT.
6. MAKE SURE THAT ALL THE COVERS TO THE
CONTROLLER ARE SECURED IN THEIR
CORRECT POSITIONS BEFORE SWITCHING
ON THE MAINS.