![MG ChargeHub 11 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/mg/chargehub-11/chargehub-11_instruction-manual_1782711028.webp)
INSTRUCTION MANUAL
MG MOTOR
28
Figure A-16 Install the rear decorative cover
Figure A-18 Fixed the decorative cover
3. Insert the front decorative cover into place from top to bottom and the back decorative cover, and
fix both sides of the front decorative cover with 2 M4*12 flower-shaped composite screws (Torque:
1.4~1.6 N.M) with column core.
• Check after installation
1. Clean up
• Dispose of all shipping and packaging materials in accordance with local regulations.
• Clean the charger and surrounding debris, such as small cables, straps, screws/mothers, etc. Do
not leave the installation tools on site or in the charger (record the type and quantity of tools to
prevent omission).
• Wipe the insulation with an antistatic cloth. Do not use any corrosive solvents.
2. Inspection
• Check that the base is secure and sealed.
• Check that the internal components of the device are securely fastened.
• Check that the electrical connections and wiring are correct and complete, that the connections
are secure, and that the grounding is reliable.
• Check that the degree of protection of the equipment meets the requirements, especially at the
cable entry at the bottom of the charger.
• View appearance, marking, integrity, cleanliness.
Содержание ChargeHub 11
Страница 1: ...7 11kW AC EV Charger MG ChargeHub Instruction Manual...
Страница 31: ...31 MG MOTOR INSTRUCTION MANUAL d Click the Ethernet button e Click Properties...
Страница 32: ...INSTRUCTION MANUAL MG MOTOR 32 f Click Internet Protocol Version 4 TCP IPv4...
Страница 35: ...35 MG MOTOR INSTRUCTION MANUAL c Find the IP settings click edit d Change the IP Settings to manual...
Страница 36: ...INSTRUCTION MANUAL MG MOTOR 36 e Set IP address 192 168 88 6 Subnet Prefix Length 24 Gateway 192 168 88 206...
Страница 51: ...51 MG MOTOR INSTRUCTION MANUAL...